Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2021 at 8:00 PM

Updated September 14, 2023

New construction of a fire / police facility in Shoal Lake, Manitoba. Design plans call for the construction of a fire / police facility.

Construction of a new RCMP Detachment. Site Location: GPS Coordinates 50.442569, - 100.598370 ; 8th Avenue by Highway 42, Size of lot is = 1.38 Hectares. TIMELINE: A request for proposal for design was previously issued and has been awarded. Tender and construction schedules may be confirmed in early fall 2021.

Design

Fire / Police

$7,800,000.00

Public - Federal

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
13
Bidding Soon
104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

Project location map

To Be Determined, Shoal Lake, MB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed