BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boston, Massachusetts. Completed plans call for site work for a water / sewer project.

Somerville MWR205 Tide Gate Replacement Q And A Open: 04/21/2021 06:15:10 PM Q And A Close: 05/06/2021 02:30:00 AM MWRA Construction Contract OP-429 will be replacing 6.5' by 6.5' existing MWR205 CSO tide gate. The work will consist of installation of stop logs, field measurements, cleaning of tide gate structure, demo of existing gate, installation of new gate, and removal of stop logs. There is no excavation required for this project. The MWR205 tide gate structure is within the MWRA chain link fence. The fence is defined as the limit of work, approximately 5 feet from the parking lot. No disruption outside the fence is anticipated. It is anticipated the Contractor will want to use the parking spaces near the tide gate structure as a temporary construction area as indicated on plans. The construction drawings state to protect the granite monument north of the tide gate structure as stated DCR during the 2-9-21 DCR/MWRA Coordination Meeting. The Notice to Proceed is anticipated in June 2021 with a duration of 270 day but the actual field work is estimated to be a total of 21 days. The contractor is expected to access the structure 2 to 3 times for field measurements, cleaning, and demo/installation. The duration of each visit is estimated to be a week. The fabrication time for the gate is 22 weeks. The first site visit is expected in July 2021 and the gate demolition/installation in December 2021. At the 2-9-21 DCR/MWRA Coordination Meeting, DCR determined that this project would be completed before the renovations to the Draw Seven Projects begin in Spring 2022

Post-Bid

Water / Sewer

$294,000.00

Public - State/Provincial

Site Work

13

9

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
189
Bidding Soon
2,680
All Active Projects
1,253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2021

June 18, 2021

img_map_placeholder

To Be Determined, Boston, MA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.