BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Norwich, Vermont. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of 6/8/2022, No Bids Were Received, the Town is unsure of Rebidding in the future. The existing timber bridge deck has been treated with creosote and emulsified asphalt. With the current bridge configuration, when temperatures rise, these contaminants liquify and drip from the underside of the bridge and can end up in the Brook. Proposed improvements include installing corrugated metal roofing and flashing on the underside of the deck to contain discharge of the contaminants and to channel them to a drip pan to be located on the abutment beam seat. The project (Moore Lane Contain (1)) consists of installing Galvalume (or approved equal) steel roofing panels and flashing on the underside of a single span timber bridge deck as a containment measure. Please refer to attached plans from Stantec Consulting Engineers for details notes regarding the work. All work shall be performed in accordance with the technical requirements of the Vermont Agency of Transportation 2018 Standard Specifications for Construction. Payment for the work shall be based on the pay units and unit prices defined in the bid tabulation and the Request for Bids. Project Location Bridge #12 carries Bridge Street over the Bloody Brook in the Town of Norwich. The structure is located approximately 100 feet East of the Beaver Meadow Road (TH 2) and Moore Lane (TH 43). Longitude and Latitude: -72.317295 , 43.725521 The existing timber bridge deck has been treated with creosote and emulsified asphalt. With the current bridge configuration, when temperatures rise, these contaminants liquify and drip from the underside of the bridge and can end up in the Brook. Proposed improvements include installing corrugated metal roofing and flashing on the underside of the deck to contain discharge of the contaminants and to channel them to a drip pan to be located on the abutment beam seat. The project (Moore Lane Contain (1)) consists of installing Galvalume (or approved equal) steel roofing panels and flashing on the underside of a single span timber bridge deck as a containment measure. Please refer to attached plans from Stantec Consulting Engineers for details notes regarding the work. All work shall be performed in accordance with the technical requirements of the Vermont Agency of Transportation 2018 Standard Specifications for Construction. Payment for the work shall be based on the pay units and unit prices defined in the bid tabulation and the Request for Bids. Intention Of Terms It is intended that the Vermont 2018 Standard Specifications for Construction shall be the basis for administering the contract. To comply with this intention, upon final execution of this contract the following changes of definitions shall be in force during this contract. Agency -- The Town of Norwich. Board -- The Town of Norwich Selectboard. Director of Engineering and Construction, also Engineer, Structures Engineer, Director, and/or Director of Project Development -- The Town of Norwich. District Transportation Administrator -- A representative of the Vermont Agency of Transportation responsible for highway maintenance who has specific duties of liaison with the Towns included within a designated Maintenance District. Laboratory -- The materials testing laboratory designated by the Town of Norwich. Secretary -- The Town of Norwich Selectboard or their designee. State, also State of Vermont -- Town of Norwich. The Town would like to have the project completed as soon as possible. All work shall be performed within the existing right-of-way limits, which are assumed to be three rods wide centered on Town Highway 43. No additional R.O.W. rights are anticipated for these repairs. Questions Due Date Questions may be submitted by email to Chris Kaufman at the following address: ckaufman@norwich.vt.us. The due date for questions is Thursday May 26th, 2022 at 5:00 PM

Final Planning

Bridges / Tunnels

$2,000,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
56
Bidding Soon
892
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

August 8, 2022

img_map_placeholder

Multiple Locations, Norwich, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.