BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Rolla, Missouri. Completed plans call for the construction of a 50,000-square-foot educational facility; and for site work for a educational facility.

Individuals with special needs as addressed by the Americans with Disabilities Act may contact 573-341-4252. Questions should be directed to Pat Litty at 573-341-4865. The CM shall have as a goal subcontracting with Minority Business Enterprise (MBE) of ten percent (10%), Women Business Enterprise (WBE), Disadvantaged Business Enterprise (DBE), and/or Veteran Owned Business of ten percent (10%) and Service Disabled Veteran Business Enterprise (SDVE) of three percent (3%). This information is provided to give an overview of the process to allow the proposer to develop a fundamental understanding of the nature of the CMR process to be followed. This will be a two-step selection. Step one will consist of a request for qualifications, review of qualifications, selection of a short list of firms.(Minimum of three (3) firms) Step two will consist of the short list of firms asked to submit cost proposals in response to the University's Request for Proposals (RFP). Detailed, comprehensive terms and conditions will be issued with the RFP. Missouri S&T is adding a two story with a basement level in approximately 50,000 sf south of the existing Havener building on campus. The Student Experience Center will incorporate collaboration space (open and closed), a multipurpose room, coffee shop, light maker space, student success center and support areas. The upper level will connect to Havener via a bridge connection with only minimal modification to Havener with bridge connection. A new service drive is to be created between Havener and the new Student Experience Center. The basement level of the new building will provide physical space for S&T's fourth geothermal plant. The physical infrastructure of the new geothermal plant is being completed under a separate design and construction project, but the new building will be serviced by the new geothermal plant and is to include the physical space for it. The CMR will be required to coordinate with the design and construction team for the geothermal project It is anticipated to have at a minimum Two (2) scope/design packages to be released as follows: Early Release Order (ERO) One bid package - Footing / Foundation - February 2022 Final/Main Package - Structure/enclosure and fit out - August 2022 Package release and schedule is flexible but the substantial completion date is to be no later than September 2023. The Construction Manager at Risk will provide preconstruction, construction phase, and post construction phase services for the duration of the project. The planning of Missouri S&T Student Experience Center is starting the Schematic Design process May 24, 2021. The program study was revised and completed April 15, 2021. The EXHIBITS attached identify the results of the program study. Receive Qualifications May 17, 2021 Notify Short-Listed Firms May 21, 2021 Issue Request for Proposals May 21, 2021 Pre- Proposal Site Meeting May 27, 2021 Interview Short Listed Firms June 03, 2021 Receive Proposals June 10, 2021 Apparent Successful Proposer Notification June 11, 2021

Award

Educational

$21,201,364.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
78
Bidding Soon
988
All Active Projects
442
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 17, 2021

July 25, 2022

September 30, 2023

img_map_placeholder

901 Facilities Ave, Rolla, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.