EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 8, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a municipal facility.

PROJECT NO. 19-035902 3/3/2022 The site visit is rescheduled for March 4, 2022 @ 10:00 AM. All attendees must be on the list. Email the name of the attendees to nia.glover@faa.gov. Limit two attendees. Aeronautical Center's main west entrance gate on South Regina Avenue and proceed to the Security Command Center just inside this entrance. 6500 S. MacArthur Blvd. Oklahoma City, OK 76139. The closing date of the annoucement is extended until March 11, 2022 @ 4:30 PM, CST. Pre-bid questions and answers: Because of formatting issues they have been removed from this section and added as an attachment . 2/25/2022 This amendment was created to add an addendum to the Specificiations titled 6974GH-22-R-00017 Addendum No. 1 - GNAS Upgrade Mech-Elec. 2/22/2022 A site visit is scheduled for Friday, February 25, 2022 at 10:00 AM. Please advise the Contracting Officer (Nia Glover, nia.glover@faa.gov) in writing of your intent to attend by noon, February 24, 2022. Your request should include the name of attendee, title of attendee, name of company, and contact information to include phone number and email address. Attendees for the site visit should enter the Aeronautical Center's main west entrance gate on South Regina Avenue and proceed to the Security Command Center just inside this entrance. NOTE: During the site visit, the FAA will not be providing transportation to the GNAS B195, in order for potential offerors to view the worksite; therefore, offerors will be required to register their vehicles and provide documentation in order to travel to the GNAS B195. Due to COVID-19 pandemic, potential offerors are limited, two attendees ONLY at the site visit. Please advise the Contracting Officer (Nia Glover, nia.glover@faa.gov) in writing of your intent to attend by noon, February 24, 2022. Telephone requests will NOT count as notification of attendance. It is very important that potential offerors notify the Contracting Officer of your intent to attend the site visit. It may be necessary to conduct the site visits in shifts; therefore, it is important that potential offerors notify the Contracting Officer of your intent to attend the site visit as previously stated in this paragraph. DO NOT ASSUME THAT YOU CAN SHOW UP FOR THE SITE VISIT UNLESS YOU HAVE NOTIFIED THE CONTRACTING OFFICER IN ADVANCE PER THE REQUIREMENTS STATED IN THIS PARAGRAPH. Please find the current COVID 19 guidance on the Safer Federal Workforce website and follow all applicable regulations. 2/22/2022 Some of the attachments that are attached to the Solicitation are not accessible. They are now being added as individual attachments. 11 documents listed in Section J of the solicitation are now attached individually. The Federal Aviation Administration (FAA), Mike Monroney Aeronautical Center (MMAC) is seeking proposals from sources capable of providing the following services for a Construction project titled: GNAS Mechanical & Electrical Upgrade in accordance with the attached Statement of Work. The Estimate Price Range: $1,000,000 and $5,000,000. This is a 100% Small Disadvantage Business Set-Aside. Please read the attached Solicitation in it's entirety and all other Attachments. The attachments are included in the one file SIR 6973GH-22-R-00017. Click the paperclip to reveal the eleven (11) documents attached to the soliciation. Follow the instructions outlined in Sections L & M for submitting a responsive proposal. Please include the solicitation number 6974GH-22-R-00017 in the subject line of all email correspondence. Submit questions NLT 4:30 PM, CST, February 25, 2022. This will allow for answers to be posted before the closing date of the Announcement. No phone calls. Email questions to Nia Glover; nia.glover@faa.gov. Proposals are due by EMAIL ONLY NLT March 7, 2022, 4:30 PM, CST. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Upgrade GNAS facility mechanical and electrical systems. Project includes replacement of the boiler, cooling tower, air handling unit, heat recovery unit, air terminal units, air devices, ductwork, controls, etc. Power revisions, lighting (both interior and exterior), lighting controls, etc.

Post-Bid

Municipal

$5,000,000.00

Public - Federal

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Heating Boilers, Condensing Boilers, Decentralized HVAC Equipment, Radiant Heating Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
40
Bidding Soon
509
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2022

May 12, 2022

img_map_placeholder

8101 S MacArthur Blvd, Oklahoma City, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

GNAS Mechanical, Electrical Upgrades Mike Monroney Aeronautical Center (MMAC)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.