Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 25, 2021 at 8:00 PM
Updated May 10, 2025
Renovation of a power facility in Batavia, Illinois. Completed plans call for the renovation of a power facility.
As of 6/10/2021 project was not yet been awarded. No estimated time frame yet. The City of Batavia seeks a contractor to bid on the following work removal and replacement of multiple breakers within City substations. The work for which bids are to be received generally and briefly consists of the following: Removal and replacement of seven (7) 1200A and four (4) 2000A, 34.5 kV breakers, in accordance with the Specifications and drawings The proposal from the Contractor shall consist of the submission of the completed Contract Documents and supplemental addendums as received from the Owner. The bid shall be made on the BID PROPOSAL, BID SCHEDULE, BID CONDITIONS, AND BID BOND provided as part of these Bidding Documents and shall be accompanied by a bid guarantee in the form of a Certified or Cashier's check from a responsible solvent bank or Bid Bond made payable to the City of Batavia in the amount of five percent (5%) of the bid amount. The amount of the bid guarantee shall be forfeited to the Owner if the Bidder neglects or refuses to enter into a Contract or to furnish performance security after the bid has been accepted. The Owner intends to accept the lowest responsible bid and the Owner reserves the right to reject any and all bids, offers, or proposals submitted, or to advertise for new bids. The Owner reserves the right to defer the acceptance of any bid and the award of a Contract for a period not exceeding sixty (60) days after the date of opening the bids The successful Bidder to whom the Contract shall be awarded shall sign the Contract, furnish a Performance Bond, or Letter of Credit in amounts equal to one hundred ten percent (110%) of the Contract Amount and required Certificates of Insurance, within fifteen (15) calendar days after the Contract has been awarded. Failure to do so shall make the Contract null and void Bidders are advised of the following requirements of this contract: 1) Illinois Prevailing Wage; 2) 5% Bid Security with submittal of bid; 3) 110% Performance Security within fifteen (15) calendar days after Contract award; 4) applicable OSHA and EPA requirements.
Award
Power Plant
$399,635.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2021
June 28, 2021
To Be Determined, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Aug 29 2025
Batavia, IL
Bid Date: Jun 04 2025
Batavia, IL
Bid Date: Jul 18 2025
Batavia, IL
Bid Date: Jun 20 2025
Batavia, IL
Bid Date: Jun 23 2025
Batavia, IL
Bid Date: Jul 03 2025
Batavia, IL
Bid Date: Jul 01 2025
Batavia, IL
Bid Date: May 21 2025
Batavia, IL
Bid Date: May 30 2025
Batavia, IL
Bid Date: May 21 2025
Batavia, IL
Bid Date: May 30 2025
Batavia, IL
Bid Date: May 09 2025
Batavia, IL
Bid Date: May 09 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
