BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a swimming pool in Winkler, Manitoba. Completed plans call for site work for a swimming pool.

The City of Winkler owns and maintains the Aquatic Centre located at 580 Park Street. The Winkler Aquatic Centre opened on July 1, 1996 and has been a popular attraction for residents and visitors during the summer months. The City has been diligent in maintaining and repairing all components of the Aquatic Centre over the last 25 years. However, over time, the speed slides have degraded to the point where ongoing maintenance and refurbishment was not enough. Recently, the City hired Western Rec to do an overall inspection and analysis of the existing Speed Slides. The resulting report recommended the speed slides be decommissioned immediately as they have become a safety hazard for patrons. City Council has approved funding to replace the Speed Slides in 2021. This City is seeking Aquatic Centre professionals to design (including engineered drawings) and install new speed slides at the Winkler Aquatic Centre. Scope of Services - Removal and disposal of existing slides - Evaluation and design of slide layout and existing support structures - Design and Engineering services - Mechanical/Plumbing - Electrical work - Integration with pool deck and existing slide support structure See Appendix A for related photos and drawings. All related professional services, materials, permits, fees, and installation to be included in proposal. All enquiries shall be made in writing to the City and will be responded to in writing. Questions during Proposal Process Enquiries regarding this RFP should be directed to Terry Fehr. Evaluation Criteria and Process Proposals will be evaluated based on the following categories: 1) Budget (maximum $150,000, all-in) 2) Design 3) Experience 4) Timeline The City of Winkler does not necessarily have to accept the lowest bid. The City has the right to reject any and all bids. The proposals will be reviewed by the City's Community Service Department. Due to Merx restricting access to their website, we are unable to collect and post plans, specs and addenda. For information on plans, specs and addenda, please contact the Owner or go to www.merx.com Awarded Sub Contractor -- Commercial Pools. Bid amount not released for publication.

Award

Swimming Pools

$300,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
4
Bidding Soon
210
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2021

July 12, 2021

img_map_placeholder

580 Park St, Winkler, MB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.