Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 16, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a municipal facility in Aurora, Colorado. Completed plans call for the renovation of a municipal facility.
The North Campus Well Field Electrical Phase II Project is for the construction of seventeen (17) upgraded electrical panels that are used to power and control well pumps in the City's North Campus Riverbank Filtration Site (RBF). The new panels eliminate electrical safety concerns identified in the most recent arc flash study that concluded the power supply and controls have inadequate separation between the 480-volt power supply and the controls system, leaving staff exposed to potential arc flash events. The original design was adequate for the applicable electrical code at the time; however, the design requires third party services to open the panels and de-energize equipment safety. This improved design will allow operations to self-perform maintenance and troubleshooting efforts and decrease the time a well remains out of service. This project addresses proper separation of the power supply from the controls cabinet and provides a safe working environment for Aurora Water staff. The new panels will also meet the City's new SCADA High Graphic Standards. Question Acceptance Deadline 06/29/2022 04:00 PM EDT Questions are submitted online No Piggyback Contract No
Bid Results
Municipal
$3,574,804.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2022
August 12, 2022
Multiple Locations, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Aug 16 2022
Aurora, CO
Bid Date: Jul 29 2022
Aurora, CO
Bid Date: Aug 05 2022
Aurora, CO
Bid Date: Aug 09 2022
Aurora, CO
Bid Date: Nov 19 2021
Aurora, CO
--
Aurora, CO
Bid Date: Aug 22 2022
Aurora, CO
--
Aurora, CO
--
Aurora, CO
Bid Date: Aug 16 2022
Aurora, CO
Bid Date: Aug 10 2022
Aurora, CO
Bid Date: Jul 29 2022
Aurora, CO
Bid Date: Jul 07 2022
Aurora, CO
Bid Date: Jun 20 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
