BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Elkhart, Iowa. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Construct nominal 72 x 40 metal building with insulation, concrete floor and foundation, doors, overhead doors, mechanical, electrical and miscellaneous associated work, including cleanup. Also construct nominal 25 x 20 hoop building with concrete floor and foundation. Sitework consists of excavation, grading, paving, sanitary sewer service, water service, and other miscellaneous work. The new maintenance building will be located at 452 NW Elm Street, Elkhart Iowa. The work will commence within ten (10) calendar days after the date set forth in written Notice to Proceed and shall be fully completed by March 25, 2022. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day the work shall remain uncompleted after the end of the contract period. The City reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be to the best interest of the City. A. Furnish all materials, labor and equipment to construct New Maintenance Building Project as set out in the Notice to Bidders. B. The new Maintenance Building shall be a pre-engineered wood post building, 72' x 40' with metal siding, standing seam roof, wall and roof insulation, and interior linear panels. Reference drawings for description of all finishes. C. The Owner has purchased and stored a Clear Span hoop structure onsite. The General Contractor is responsible for installation of the existing hoop structure on new footings and foundation walls as shown in the project drawings. The General Contractor is responsible for anchorage and securing existing hoop structure to new foundation walls per manufacturer's recommendations. Reference Appendix A for Clear Span structure information. The work will commence within ten (10) calendar days after the date set forth in written Notice to Proceed and shall be fully completed by September 30, 2022.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$516,900.00

Public - City

New Construction, Site Work

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
41
Bidding Soon
468
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2021

December 10, 2021

img_map_placeholder

452 Elm St, Elkhart, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.