Site work for a water / sewer project in Snoqualmie, Washington. Completed plans call for site work for a water / sewer project.

Estimated Project Cost: $550,000 to $600,000 The said bids will then and there be opened and recorded. Due to the ongoing COVID-19 crisis, City offices are closed, and the bid opening may not be attended by the public. Bids received after the time fixed for opening cannot be considered. For questions regard-ing the project, contact. Andrew Vining, PE (City Project Engineei) at 425-395-0051 or avining@sno-qualmiewa. gov. In summer 2007, horizontal directional drilling was performed to install a 16-inch diameter DR-9 HDPE pipe for a 1,000-foot long crossing below the Snoqualmie River, just north of the project site. A case study paper about the project was written and is available for examination by contacting Andrew Vining 24-inch Sewer Gravity Main Open-Cut 12-inch Sewer Force Main HDD 12-inch Sewer Force Main Trench Safety and Shoring Restoration of Disturbed Areas The City may reject any bid not accompanied by bid security or data required by the bid documents. A bid bond in the amount of 5% of the bid proposal must be submitted with the bid proposal. Factors considered in award of the contract will include the Contractor's experience and performance on previous contracts. Special Requirements: All bidders must be licensed contractors registered in the State of Washington. All work performed on this project will be subject to the state prevailing wages. Snoqualmie is an Equal Opportunity and Affirmative Action Employer. Small, Minority-Owned, and Women-Owned business enterprises are encouraged to submit bids. The flow meter vault, connection to existing force main at the Lift Station 1 site, and associated backfilling/compaction shall be constructed, tested, and City-approved by October 15th, 2021. The horizontal directional drilling work included in this project for crossing below Kimball Creek is subject to a permitted timing restriction window of July 16th, 2021 through October 30th, 2021 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$812,397.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
29
Bidding Soon
852
All Active Projects
372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

July 16, 2022

img_map_placeholder

To Be Determined, Snoqualmie, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.