Site work for a water / sewer project in Harrisburg, Pennsylvania. Completed plans call for site work for a water / sewer project.

Requests for clarification are due Wednesday, June 23, 2021 12:00:00 AM [(UTC-05:00) Eastern Time (US & Canada)]. The project consists of and includes all materials, equipment and labor necessary to furnish and install the work associated with the following Lots as shown on the Drawings and noted in the Specifications: Lot 1 - Spring Creek 1 Trunk Replacement - 60 LF of 6-inch laterals, 750 LF of 8, 10 and 18-inch PVC and 300 LF of 14-inch DIP (epoxy lined) gravity sewer, pipe bursting 460 LF of existing pipe with 12-inch PE, 8 manholes and other miscellaneous work. Lot 2 - Spring Creek Mini-Basin SC-2B Trunk Replacement - 10 LF of 8-inch PVC and 1,020 lineal feet of 12-inch PVC gravity sewer, 4 manholes and other miscellaneous work. Lot 3 - Beaver Creek Meter Chamber - modifying an existing 9' by 17' concrete structure at grade by constructing concrete walls and a top slab to raise the elevation of the structure by approximately 4.7 feet, relocating the electrical components from their current location to within a new precast concrete building to be located on top of the new raised structure. Each Proposal shall be accompanied by a Certified Check or Bid Bond payable to LOWER PAXTON TOWNSHIP in an amount of not less than ten percent (10%) of the total bid in accordance with the provisions in the Instructions to Bidders. Each Proposal must be complete and the right is reserved to reject any and all Proposals and to accept any Proposal deemed to be most favorable to the interests of LOWER PAXTON TOWNSHIP. LOWER PAXTON TOWNSHIP is an equal opportunity employer. Successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the contract price within fifteen (15) days of receiving a Notice of Award letter. Bidders can utilize the PennBid Program without any initial or recurring costs. A fee 0.33% of the total work awarded, capped at $5,000, is assessed only to the bidder who is awarded the project.

Award

Water / Sewer

$937,360.00

Public - City

Site Work

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
99
Bidding Soon
1,391
All Active Projects
614
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2021

July 30, 2021

img_map_placeholder

Multiple Locations, Harrisburg, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Sanitary Sewer Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.