Demolition, site work, paving, renovation and addition to a mixed-use development in Quincy, Illinois. Completed plans call for the addition of a 14,170-square-foot educational facility; for the renovation of a 30,070-square-foot educational facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Construction of a new 14,170 SF addition and partial renovation of the existing 30,070 SF facility. Site work includes but is not limited to the following: a new entrance drive, parking lot expansion, site grading, and site utilities. Structural work includes but is not limited to building foundations and structural steel erection. Fire sprinkler work includes a new fire sprinkler system through the existing building and new addition. Plumbing work includes but is not limited to a new water service, new sanitary sewer lateral, sand/oil separator, and new multi-user restrooms. HVAC work includes but is not limited to new welding exhaust and make-up air units, new roof top units, new dedicated outside air units, new VRV system, and new exhaust systems. Electrical work includes but is not limited to a new generator, new power and distribution, and new lighting. Fire alarm work includes and new fire alarm system through the existing building and new addition. The issuing office for the Bidding Documents is: Klingner & Associates, P.C. Bidding documents including Drawings, Project Manual, Addenda, List of Plan Holders of Record, and Bid Tabulations will be available electronically Technical questions regarding interpretations of the bidding documents shall be directed to Amanda Springer by email at aspringer@klingner.com of Klingner & Associates PC with subject line to read: JWCC WDC Request for Information, NOT City Blue Technologies. All proposals shall be accompanied by either a bid bond on the "Proposal Bid Bond" form contained in the proposal, executed by a corporate surety company satisfactory to John Wood Community College or a bank cashier's check, an irrevocable letter of credit or a properly certified check payable to the John Wood Community College for not less than 5 percent (5%) of the amount bid, or for the amount listed in the specifications. The John Wood Community College reserves the right to reject any or all proposals and to waive technicalities and reserves the right to determine the qualifications of any and all contractors to perform the work required under this contract. No bid may be withdrawn after the time for opening of the bids is past. Bidders are notified that not less than the prevailing wage rate as determined by the Illinois Department of Labor and Davis Bacon Wage Rate Act shall be paid to all workmen performing work under this contract. Bids may be held by the John Wood Community College for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. This Project to which the construction work covered by this Contract pertains is being issued by the United States of America through federal assistance provided by the U.S. Department of Commerce - Economic Development Administration (EDA). EDA Contracting Provisions are included in this Contract and all subcontracts or related instruments pursuant to the provisions applicable to such federal assistance from EDA. The John Wood Community College is an Equal Opportunity Employer and encourages minority group participation in the bidding and construction process.

Award

Educational

$25,000,000.00

Public - State/Provincial

Addition, Demolition, Paving, Renovation, Site Work

105

29

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Wood Frames
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Vapor Retarders, Roofing and Siding Panels, Metal Roof Panels, Membrane Roofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Metal Lockers, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Casework, Countertops, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
25
Bidding Soon
315
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

August 29, 2022

img_map_placeholder

4220 Kochs Ln, Quincy, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Workforce Development Center Expansion

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.