BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in San Rafael, California. Completed plans call for the renovation of a educational facility.

Re-Roof - approximate measurements of roofs as follows. Contractor shall be responsible for supply and installation of complete and working system, verification of all dimensions for inclusion in bid. All roofing materials shall provide minimum manufacturer's warranty of 25 yearscontractor's final design shall include manufacturer verification of installation and issuance of warranty prior to retention release. Marin County Office of Education will accept roofing materials manufactured by Firestone, Johns Manville, or Sarnafil. All edge metals shall be 22ga or better. Existing wood siding to be covered with Super JumboTex 60 min super resistive weather barrier (or approved equal), followed by James Hardie HZ10 Sierra 8 fiber cement panels (or approved equal) for entire exterior of building- roughly 5,000 square feet. All door, window and louver locations to receive installation of Hardie HZ10 fiber cement trim. All existing conduit, light fixtures, fire alarm devices, Knox key boxes or other wall mounted devices shall be removed and reinstalled in existing locations with required adaptation for added thickness of fiber cement panels; contractor to verify all surface mounted accessories, lighting, etc. for inclusion in bid. New 6" galvanized base flashing to be installed for entire North and West elevation of building. For East elevation, contractor shall include 250 square feet of woodpecker damaged wood siding removal for locations 12' and higher, replacement with 3/8" common plywood sheathing, and installation of HZ10 Sierra 8 fiber cement panels to provide continuous finish for East elevation. East elevation of building currently has two large HVAC condensing units and saw-dust collection system in place. Contractor shall assume all necessary adaptation and trim around existing ductwork. Dust collection system to be disconnected from existing power and ductwork and abandoned in place. Dust collection ducts shall be cut back from interior and exterior wall and capped at dust collector. Power shall be safely disconnected, conduits intercepted and removed from exterior wall, and finished condition left safely abandoned.

Post-Bid

Educational

$25,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
81
Bidding Soon
1,820
All Active Projects
743
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2021

July 26, 2021

img_map_placeholder

Multiple Locations, San Rafael, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.