BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 19, 2021 at 8:00 PM

Updated April 13, 2024

Site work for a bridge / tunnel in Oregon, Missouri. Completed plans call for site work for a bridge / tunnel.

The proposed work includes: Road 250 Installation of a 72" diameter x 112' long CMP Culvert including Rock Blanket and Road Aggregate. This is a public works' project in the State of Missouri. Missouri's Prevailing Wage Law establishes a minimum wage rate for public works' projects in Missouri valued over $75,000. If bid value is applicable to this, the minimum wage rates for this project have been predetermined as required by law and are set forth in the bid proposal. Certified payroll shall be submitted for each employee and approved on a weekly basis. Safety Training Program - Bidders are informed that the project is subject to the requirements of Section 292.675 RSMo., pertaining to on-site employees completing a course in construction safety and health approved by the Occupational Safety and Health Administration (OSHA). Enrollment in Federal Work Authorization Program - Bidders are informed that, pursuant to Section 285.530 RSMo., the successful bidder shall, by sworn affidavit and provision of documentation, affirm its enrollment and participation in a federal work authorization program with respect to the employees working in connection to the contracted services. The Holt County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids The County reserves the right to reject any and all bids, and to waive all informalities or irregularities in bids. The County also reserves the right to reject any and all construction upon completion if it does not meet the specifications or fails to meet normal quality criteria. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. Proposals must be on forms provided. An acceptable alternate bid bond form may be used. Estimate = under 100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$65,215.00

Public - County

Site Work

6

5

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
78
Bidding Soon
1,022
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2021

August 5, 2021

Project location map

To Be Determined, Oregon, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.