BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2021 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a fire / police facility in Fayetteville, Arkansas. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The City of Fayetteville is accepting package bids from properly licensed and authorized firms for the construction of the Police Department Headquarters - Package #4 (finishing packages) located in Fayetteville, AR. This project includes but is not limited to carpentry, cabinetry, doors/hardware, flooring, paint, canopies, signage, lockers, appliances, shades and landscaping. All questions during the bidding process shall be addressed to Andrea Foren, City Purchasing Manager. The City of Fayetteville shall not be responsible for lost or misdirected bids, or failure of bidder's technical equipment. City of Fayetteville Purchasing Division - Room 306 113 West Mountain Street Fayetteville, AR 72701 Each bid shall be accompanied by a cashier's check from a bank doing business in the State of Arkansas or a corporate bid bond in an amount not less than five (5) percent of the amount bid. In the event a bidder opts to submit a cashier's check for a bid bond, the actual physical cashier's check shall be delivered to the City prior to the deadline. A one hundred percent (100%) performance and payment bond is required with the contract awarded. A State of Arkansas Contractor's License is required for all bidders, as required by the ACLB, & license shall be valid at the time of bid deadline. Pursuant to Arkansas Code Annotated 22-9-203 The City of Fayetteville encourages all qualified small, minority and women business enterprises to bid on and receive contracts for goods, services, and construction. Also, City of Fayetteville encourages all general contractors to subcontract portions of their contract to qualified small, minority and women business enterprises. The City of Fayetteville reserves the right to waive irregularities, reject bids, and postpone the award of any Contract for a period which shall not exceed beyond ninety (90) days from the bid opening date. Questions Due Date: Jun 29th 2021, 4:00 PM CDT

Post-Bid

Fire / Police

$28,000,000.00

Public - City

LEED Certification, New Construction, Site Work

Subscribe For Documents

94 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
73
Bidding Soon
938
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2021

June 20, 2022

Project location map

To Be Determined, Fayetteville, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.