BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work, paving and new construction of a bridge / tunnel in Platte City, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of Aug 11, 2021, the project has not yet been awarded. A timeline for award has not yet been established.** Combination bids will be required on the projects listed below. The bidder will be declared unresponsive if bids are not submitted for both bridges. The combination of the total prices of the bids for both bridges will be used to determine the lowest, responsive, responsible bidder. Anticipated bid Cost Range - $600k - $1M Anticipated notice to proceed September 2021 The proposed work includes: BRO-B083(28) Bridge #0510010 Removal of existing bridge, constructing new bridge and roadway approaches. The DBE Goal for this project is 7%. Any questions regarding the Lamar Road Bridge #0510010 project plans, specifications, or bid documents should be directed to Anderson Engineering, Inc., at 816-777-0400. BRO-B083(29) Bridge #1560029 Construction of a 106 foot single span prestressed concrete NU-Girder bridge, approach roadway work, and any incidental work in accordance with the plans and specifications. The DBE Goal for this project is 8%. Any questions regarding the Harpst Road Bridge #1560029 project plans, specifications, or bid documents should be directed to Great River Engineering, at 816-436-4440 The proposed work, hereinafter called the work, includes: Removal of existing bridge, construction of a 106 foot single span prestressed concrete NU-Girder bridge, approach roadway work, and any incidental work in accordance with the plans and specifications. The project is located on Harpst Road, in Section 11, Township 53 N, Range 36 W, Platte County, Missouri, over Bear Creek.

Award

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
40
Bidding Soon
732
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2021

September 6, 2021

img_map_placeholder

Multiple Locations, Platte City, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.