Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 26, 2021 at 8:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Aurora, Colorado. Working plans call for site work for a water / sewer project.
**As of 8/926/2021 Bids were rejected, therefore, no award will be made. Upgrade service line appurtenances to meet current City of Aurora specifications wherever possible. Ensure proper operation of all meter service line valves for emergency isolation. Prevent dangerous confined space issues. Ensure the safety of personnel performing work in meter vaults i.e. testing and maintenance of meters. Upgrading of identified aging infrastructure. Replace the existing water meter service line appurtenances in meter vaults (i.e. valves, tees, elbows, ductile iron pipe, check valve, coupler and damaged or undersized vaults). In the case of irrigation meter vaults, they will not include meter by-pass plumbing, but will include outside vault downstream valve and then a "T" or saddle to provide seasonal drainage of irrigation line. Replace vault tops that will accommodate composite rings and covers. Additionally, if the vault is to be replaced, or excavation will be done to replace a vault top or to install a downstream valve and "T" or saddle to provide drainage, extensive preparation will include; securing utility locates, submission of a traffic plan (if applicable), vault excavation within applicable safety guidelines including shoring and confined space safety guidelines, and post backfill area remediation. Question Acceptance Deadline 06/29/2021 04:00 PM EDT Questions are submitted online No Reference Number 0000263241 Any questions must be submitted in writing by email to Steve Hocker, Project Manager, at shocker@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org Emailed questions shall contain the project name and number in the email subject line, and must be received no later than 2:00 p.m., local time, June 29, 2021. Questions will be answered via addendum posted to The Rocky Mountain E-Purchasing System aka BidNet.
Final Planning
Water / Sewer
$116,603.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2021
February 28, 2022
Multiple Locations, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Jun 24 2021
Aurora, CO
Bid Date: Feb 28 2022
Aurora, CO
Bid Date: Nov 06 2023
Aurora, CO
Bid Date: Jun 08 2022
Aurora, CO
Bid Date: Oct 05 2023
Aurora, CO
Bid Date: Oct 24 2023
Aurora, CO
Bid Date: Nov 12 2021
Aurora, CO
Bid Date: Oct 28 2021
Aurora, CO
Bid Date: Mar 09 2022
Aurora, CO
Bid Date: Mar 03 2022
Aurora, CO
Bid Date: Mar 14 2022
Aurora, CO
Bid Date: Mar 14 2022
Aurora, CO
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed