BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2021 at 8:00 PM

Updated February 13, 2024

Site work for a playground / park / athletic field in Renton, Washington. Completed plans call for site work for a playground / park / athletic field.

Description of Work: The Work includes, but is not limited to: Renovation of the existing playfield with TESC/SWPPP measures, removal of existing sod and underlying organic materials, removal and replacement of the existing backstop fencing, grading, installation of a new irrigation system, perimeter french drains and catch basin inlets, playfield subgrade establishment with furrows and pea gravel, import and placement of sand root zone and infield mix materials, and imported sand-based natural turf sod surfacing. Architect/Engineer's Cost Opinion: $1,000,000 - $1,250,000 A plan holder's list is also available. To be added to the plan holder's list, send an email to seattle.bid.services@e-arc.com. Bid Documents Return: Deposits will be returned to Bidders upon return of the Bid Documents to ARC in good condition within 10 days following Bid Opening. Bid Bond: Certified check, bank cashiers check, or bid bond is required with each Bid, Make checks payable to the Renton School District; furnish bond executed by a licensed bonding agency authorized to do business in the locality of the project. Apprenticeship Requirement: This Project is estimated to cost one million dollars or more and this Project is subject to the apprenticeship requirements of RCW 39.04.320. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Right to Reject: The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right to waive any irregularities in any Bid. Withdraw of Bid: No Bid may be withdrawn, except with the express permission of the Owner, after the time set for the opening thereof, unless the award of Contract is delayed for a period exceeding 45 days. The Contractor shall achieve Substantial Completion of the Work no later than as described in the Contract Documents, and to finally complete work within 60 calendar days after Substantial Completion of all of the Work

Award

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Site Work

20

13

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
75
Bidding Soon
1,762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2021

August 30, 2021

Project location map

2501 Union Ave NE, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.