Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Renton, Washington. Completed plans call for site work for a playground / park / athletic field.
Description of Work: The Work includes, but is not limited to: Renovation of the existing playfield with TESC/SWPPP measures, removal of existing sod and underlying organic materials, removal and replacement of the existing backstop fencing, grading, installation of a new irrigation system, perimeter french drains and catch basin inlets, playfield subgrade establishment with furrows and pea gravel, import and placement of sand root zone and infield mix materials, and imported sand-based natural turf sod surfacing. Architect/Engineer's Cost Opinion: $1,000,000 - $1,250,000 A plan holder's list is also available. To be added to the plan holder's list, send an email to seattle.bid.services@e-arc.com. Bid Documents Return: Deposits will be returned to Bidders upon return of the Bid Documents to ARC in good condition within 10 days following Bid Opening. Bid Bond: Certified check, bank cashiers check, or bid bond is required with each Bid, Make checks payable to the Renton School District; furnish bond executed by a licensed bonding agency authorized to do business in the locality of the project. Apprenticeship Requirement: This Project is estimated to cost one million dollars or more and this Project is subject to the apprenticeship requirements of RCW 39.04.320. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. Right to Reject: The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right to waive any irregularities in any Bid. Withdraw of Bid: No Bid may be withdrawn, except with the express permission of the Owner, after the time set for the opening thereof, unless the award of Contract is delayed for a period exceeding 45 days. The Contractor shall achieve Substantial Completion of the Work no later than as described in the Contract Documents, and to finally complete work within 60 calendar days after Substantial Completion of all of the Work
Award
Playgrounds / Parks / Athletic Fields
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
July 1, 2021
August 30, 2021
2501 Union Ave NE, Renton, WA
Related To This Project
Renton, WA
Bid Date: May 18 2021
Renton, WA
Bid Date: May 12 2021
Renton, WA
Bid Date: Apr 21 2021
Renton, WA
Bid Date: Feb 09 2021
Renton, WA
Bid Date: Apr 06 2021
Renton, WA
Bid Date: Apr 13 2021
Renton, WA
Bid Date: Jun 02 2020
Renton, WA
Bid Date: Jun 02 2020
Renton, WA
Bid Date: Aug 05 2021
Renton, WA
Bid Date: Jul 09 2020
Renton, WA
Bid Date: Apr 20 2021
Renton, WA
Bid Date: May 04 2021
Renton, WA
Bid Date: Mar 05 2024
Renton, WA
Bid Date: Feb 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--