BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Duluth, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project consists of concrete pavement rehabilitation on 21 st Avenue East between London Road and Superior Street; full depth concrete intersection pavement reconstruction and new signals at the intersections of 21 st Avenue East and Superior Street and 2 nd Street; bituminous mill and overlay on 21 st Avenue East between Superior Street and Woodland Avenue; ADA improvements; storm sewer improvements; and concrete sidewalks and driveways. Questions pertaining to this project should be directed to: Alex Popp, PE apopp@duluthmn.gov 218-730-5087 Bid surety in an amount equal to five per cent (5%) of the total bid shall be submitted with each bid. Electronic bid surety can be submitted using Surety 2000 or SuretyWave. Bid bonds may be emailed to purchasing@duluthmn.gov. The emailed bid bond must be received by purchasing office prior to the bid opening, and must be verifiable with the surety company. The City of Duluth reserves the right to waive informalities and to reject any or all bids Phase 1 includes all work on the project between Superior Street and Woodland Avenue. In addition to other work, Phase 1 consists of completing all work on the project as required to meet the requirements of Intermediate Completion Date #1. 4thStreet and Superior Street shall remain open to traffic at all times. Refer to traffic control plans and other sections of this special provision for additional requirements. Phase 2 includes all work on the project between London Road and 2 nd Street. In addition to other work, Phase 2 consists of completing all work on the project as required to meet the requirements of Intermediate Completion Date #2. 4 th Street and 2 nd Street shall remain open to traffic at all times. Refer to traffic control plans and other sections of this special provision for additional requirements Phase 3 includes all work on the project between Superior Street and Woodland Avenue to complete final milling and paving. In addition to other work, Phase 3 consists of completing all work on the project required to meet the Final Completion Date. Final completion- June23, 2023.

Under Construction

Roads / Highways

$2,722,950.00

Public - City

Paving, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
107
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 17, 2022

img_map_placeholder

N 21st Ave E, Duluth, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.