Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a municipal facility in Milton, Vermont. Completed plans call for the construction of a 30,000-square-foot, seven-acre municipal facility; and for site work for a municipal facility.
As of August 31, 2023, there was a ground-breaking ceremony earlier this month. *The closed solicitation has been included below for reference: The Town of Milton's current Department of Public Works (DPW) Highway Facility is located on Ice House Road, adjacent to Arrowhead Lake Dam and the Lamoille River. This location provides a centralized site to access the town for general maintenance and snow plowing, however, there are several drawbacks associated with the location and the garage itself. The location is too close to the Lamoille River, and not an ideal location to store salt and liquid chloride for winter operations and maintenance. The building was constructed over 70 years ago, and was never meant to be a DPW facility. The structure is too small to house all of Miltons heavy equipment, does not have a wash down bay, and has numerous other deficiencies. The new facility will be located on a 6.7-acre parcel adjacent to Bombardier Park, off Park Place, and adjacent to the Town of Milton Municipal Complex. See attached draft site plan. On Town Meeting Day 2022, Milton voters passed a $5.5M dollar bond to construct a new public works facility. Additionally, there are ARPA funds and other grants/monies available to assist the town in paying for this project. The project consists of the structural, mechanical, electrical, plumbing, HVAC, etc., design and construction of a new, 30,000 square foot public works building. The town is currently working with Krebs & Lansing Consulting Engineers on geotechnical investigations and site improvements, including bringing water and wastewater infrastructure to the project site. Additionally, the Town will be contracting with an Architect/Engineering consultant, who will be responsible for working with the CM during the design phase of the project. The concept of having a CM under contract during the design phase of the project, is to save time and money by providing constructability insight, review and cost estimating during the initial stages of the project. The team of the Town of Milton DPW, Town Engineer, Town Manager, Design Architect/Engineer, Civil Engineer, and Construction Manager will work together during all phases of the project to provide a project completed on time, with quality, and within budget. Written questions are due by Thursday, July 14, 2022, 2:00 PM. It is the Towns desire to have the design and construction of the project completed by October 2023. Once an architect/engineer and construction manager are under contract, the project team will develop a schedule to meet this project completion end date. The CM shall submit a proposed schedule for the project, with the Town understanding it may change based on material availability and other factors The Construction Management Firm, prior to being awarded a contract, shall apply for registration with the Vermont Secretary of State's Office to do business in the State of Vermont, if not already so registered. The registration form may be obtained from the Vermont Secretary of State, 26 Terrace Street, Montpelier, VT 05609-1104. The telephone number is (802) 828-2386. The contract will not be executed until the Consultant is registered with the Secretary of State Office.
Under Construction
Municipal
$6,500,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2022
August 21, 2023
To Be Determined, Milton, VT
Related To This Project
Milton, VT
Bid Date: Aug 05 2022
Milton, VT
Bid Date: Sep 23 2022
Milton, VT
Bid Date: Sep 16 2022
Milton, VT
--
Milton, VT
--
Milton, VT
Bid Date: Mar 15 2023
Milton, VT
Bid Date: Mar 03 2023
Milton, VT
Bid Date: Mar 17 2023
Milton, VT
Bid Date: Jul 22 2022
Milton, VT
Bid Date: Jul 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.