Site work for a mixed-use development in Yuba City, California. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.

The City of Yuba City requires the replacement of (1) 60" Walker Process Type SWP-CL Clarifier Drive mounted on an existing 90' Diameter Secondary Clarifier. The work includes but is not limited to labor, material and equipment, services required for construction, startup and testing, and all necessary items required to complete the successful removal and installation of new or refurbished drive unit. The Contractor shall replace one (1) existing clarifier drive and motor with 60" Walker Process Type SWP-CL Clarifier Drive or approved equal. The Contractor shall be responsible for furnishing all crane and lifting equipment for removal of the clarifier bridges, removal of existing drive and motor, installation of new or refurbished drive. The Scope of Work under this contract for replacement of the Clarifier Drive includes the following major tasks to be done by Contractor: a. Furnish all labor, equipment, and materials to dismantle and remove the clarifier drive, bridge and associated handrails, walkways, piping, process connections, etc., including, but not limited to, crane, mats and rigging equipment as needed. b. Furnish all labor, equipment and materials to install new clarifier drive on original clarifier mechanism mounting plates including rake and drive leveling and replacement of nuts, washers, connectors and appurtenances as needed, including, but not limited to all new hardware as required. c. Furnish all labor, equipment and materials to reinstall clarifier bridge, handrails, walkways, piping and process connections, including, but not limited to, crane, mats and rigging equipment as needed, including, but not limited to all new hardware as required. d. Testing Plans including rake and drive leveling procedures, checkout, preliminary testing and operational testing procedures for placing the newly installed drive into service. Please do not hesitate to contact Nick Menezes with any questions or concerns.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
54
Bidding Soon
929
All Active Projects
389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2022

October 31, 2022

img_map_placeholder

To Be Determined, Yuba City, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.