Published July 26, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a sidewalk / parking lot in Peoria, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of January 31, 2022, the project has been awarded to Knapp Concrete, Inc. and the awarded amount is $710,319.00. The estimated construction date is start of Spring 2022.** The proposed improvement consists of construction of approximately 9,100 Square Feet of PCC Sidewalk, 4 , 80 Square Feet of Detectable Warnings, 930 Square Yards of Driveway Pavement, 2,500 feet of new curb and gutter, removal, restoration, and additional associated pay items for pedestrian improvements located throughout the City of Peoria. Project completion date is set at June 15, 2022. All proposals must be accompanied by cash, certified check, cashier s check or a bid bond for not less than five percent (5%) of the amount of the bid. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Stormwater Engineer. Compliance with the Illinois PrevailingWage Act is required under this contract. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals.

Award

Sidewalks / Parking Lot

$710,319.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
55
Bidding Soon
679
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2021

March 21, 2022

img_map_placeholder

Multiple Locations, Peoria, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.