BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Edmonton, Alberta. Contact the soliciting agency for additional information.

Due to the current Covid-19 pandemic, proposals must be submitted by Email to this email address: AEP.OIB-Contracts@gov.ab.ca . It is the bidders' responsibility to ensure the bid is received by the department. The department will not be responsible for any lost bid. It is the Proponent's responsibility to ensure its Proposal is received before the RFP Closing Date and Time to the Email address specified in this RFP. In responding to this RFP, the Proponent's attention is drawn to the following: a) Proposals received after the RFP's Closing Date and Time will be rejected. b) Ambiguous, unclear or unreadable Proposals may be rejected. c) Proposals must be delivered by Email, clearly identified with the RFP's number, Closing Date and Time in the subject line of the Email: d) Proposals must be delivered as follows: Attention: Santosh GC RFP Number: 22TDRRSD892 AEP.OIB-Contracts@gov.ab.ca Closing Date & Time: 14:00:59 Alberta Time, July 13, 2021 d) The time and date of receipt of Proposals will be recorded on the Proposals upon delivery to the above address. Proposals must be received prior to the RFP's Closing Date and Time. Opportunity Description: AEP requires the services of an Engineering Consultant to undertake a study to develop the options to implement a seepage monitoring system. The services to be provided shall include: 1. Review previous studies, information, drawings, photography, technical reports, construction records and any additional information related to the project. 2. Review and assess the seepage monitoring system for the dam including the surveillance plan related to seepage. Identify any shortcoming and required improvements. 3. Conduct a site visit as necessary and detailed topographical survey of the required area. 4. Review the subsurface conditions of the site such as nature and thickness of alluvial soils and bedrock and conduct any assessment necessary to implement the seepage monitoring system. 5. Provide the feasible options of seepage monitoring system including real time reporting for the dam site. 6. Assess the viability and effectiveness of potential seepage monitoring options for the dam site based on above findings. Separation of surface runoff and fines should be considered in the assessment of the options. 7. Review landownership and describe implication on various proposed options. 8. Prepare conceptual plans and preliminary design of the proposed options to enable measurement of seepage flows. For a preferred option, the study shall include: a. conceptual plans and detailed designs, b. detailed design drawings, c. detailed cost estimates, d. regulatory requirements (if any) and e. time-line for construction. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
245
All Active Projects
90
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

img_map_placeholder

Multiple Locations, Edmonton, AB


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.