BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of a municipal facility in Coshocton, Ohio. Conceptual plans call for the renovation of a municipal facility.

The Coshocton County Port Authority intends to contract for architectural services in connection with the development of the Coshocton Collaborative. An existing building in downtown Coshocton will be converted to a unique maker space, business incubator, and co-working facility that will promote entrepreneurship and foster economic growth. Firms interested in being considered for a contract to provide the required services should submit a statement of qualifications. Statements received after this dead- line will not be accepted. Statements of qualifications should include information regarding the firm's history; education and experience of owners and key technical personnel who be assigned to this project; the technical expertise of the firm's cur- rent staff; the firm's experience in planning, design, construction administration and observation of similar projects; staff availability; the firm's equipment and facilities; experience with U.S. Economic Development Administration requirements and funding programs; references; and any previous work performed for the Coshocton County Port Authority or in Coshocton County. Statements of Qualifications should be submitted to Tiffany Swigert, Coshocton County Port Authority at tiffanyswigert@coshoctoncounty.net. As required by Ohio Revised Code 153,65-73, responding firm's will be evaluated and ranked in order of their qualifications. Following this evaluation, the Coshocton County Port Authority will enter into contract negotiations with the most highly qualified firm. The Coshocton Collaborative will be located at 534/538 Main Street and the scope of services will include planning, design, construction administration and observation as well as technical assistance needed to support funding applications to include an application to the U.S. Economic Development Administration and other sources of funding. The estimated total budget for this project is approximately $2.4 Million. The Coshocton County Port Authority anticipates that design will commence upon approval of funding applications in late 2021 or early 2022 and anticipates that construction will take 12 to 18 months to complete following plan approval.

Conceptual

Municipal

$2,400,000.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
117
Bidding Soon
2,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2022

Project location map

To Be Determined, Coshocton, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.