BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2022 at 7:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Oroville, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Central Ave & Main St Resurfacing Project and Deerpath and Kay Water Main Improvements is a federally funded project that consists of HMA grinding and overlay of Central Avenue between Main Street and the west City limits and installation of 1500 feet of new water main on Deerpath and Kay streets. Additional improvements include: demolition, curb, gutter, sidewalk, surfacing, paving, stormwater, pavement markings, traffic control, erosion control, water services, water connections, hydrants and other work. The project requires FHWA Buy America requirements.

Post-Bid

Roads / Highways

$750,000.00

Public - City

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
5
Bidding Soon
274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

February 10, 2022

Project location map

Multiple Locations, Oroville, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.