Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Piney Point Village, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The project work limit is Beinhorn Road, from Hedwig Road to Kuhlman Road.The work primarily consists of the in-place pulverization of the existing roadway material. After pulverization, a stabilization agent will be mixed into the existing roadway material and the material will be compacted, graded and shaped. A two-inch thick asphalt surface will be placed on the stabilized base material. Ancillary work includes traffic control, and replacement of existing pavement markings. Each bid shall be accompanied by a bid guarantee in the form of acertified check, cashiers check,or acceptable Bid Bond, payable to City of Hunters Creek Village in an amount not less than 5% of the maximum Bid price submitted, as a guarantee that the bidder will enter into a contract within Ten (10) days after receipt of the contract documents. The right is reserved, as the interest of the Authority may require, to reject any and all bids and/or to waive any informality in bids received. The Work in this project includes the following: "City of Hunters Creek Village - Beinhorn Road Reconstruction" 1. The project is located on Beinhorn Road from Hedwig Road to Kuhlman Road and on Wade Hampton Drive from Beinhorn to 12 Oaks Drive. a. On Beinhorn Road, the work primarily consists of the in-place recycling of existing pavement materials and a 2-inch thick asphalt overlay. Ancillary work includes, traffic control and pavement markings. b. Pulverize the existing paving materials 10 inches deep. c. Treat the pulverized material with Tru Bln at 50 lbs per SY, mix and compact. d. Grade the stabilized material to shape at an elevation 2inches lower than the existing roadway. Overlay the roadway with 2 inches of asphalt surface mix. e. On Wade Hampton Drive, the work primarily consists of milling the surface 2 inches deep and placement of a 2-inch thick Type D asphalt overlay. 2. Adhere to traffic control plan, including proper signage and barricade placement, as shown in plans. 3. Clean up work area and properly dispose of all waste resulting from construction. 4. Replace any items damaged as a result of construction. 1.03 WORK SEQUENCE A. Phase 1 shall consist of the reconstruction of Beinhorn Road, from Voss to Kuhlman and the overlay of Wade Hampton Drive. The Phase 1 reconstruction of Beinhorn does not include the milling and overlay of roadway transitions on Storywood Drive, Flint River Drive, and Country Lane or any driveway transitions. B. Phase 2 shall consist of the reconstruction of Beinhorn Road from Voss to Hedwig Road, and the milling and overlay of all roadway transitions, driveways, and driveway transitions. C. The CONTRACTOR is required to determine his own method of construction and detailed work sequence in coordination with the City Engineer so long as the restraints are observed and the overall project completion time is achieved (identified in the Contract Documents).
Award
Roads / Highways
$414,590.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2021
August 20, 2021
Beinhorn Rd, Piney Point Village, TX
Related To This Project
Piney Point Village, TX
Bid Date: Nov 30 2023
Piney Point Village, TX
--
Piney Point Village, TX
--
Piney Point Village, TX
Bid Date: Aug 29 2024
Piney Point Village, TX
Bid Date: Sep 26 2024
Piney Point Village, TX
Bid Date: Oct 03 2024
Piney Point Village, TX
Bid Date: Oct 03 2024
Piney Point Village, TX
Bid Date: Feb 24 2022
Piney Point Village, TX
Bid Date: Dec 16 2021
Piney Point Village, TX
Bid Date: Aug 24 2023
Piney Point Village, TX
Bid Date: Jun 01 2023
Piney Point Village, TX
Bid Date: Apr 04 2023
Piney Point Village, TX
Bid Date: Jul 14 2022
Piney Point Village, TX
Bid Date: Dec 09 2019
Piney Point Village, TX
Bid Date: Sep 12 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.