BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Piney Point Village, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project work limit is Beinhorn Road, from Hedwig Road to Kuhlman Road.The work primarily consists of the in-place pulverization of the existing roadway material. After pulverization, a stabilization agent will be mixed into the existing roadway material and the material will be compacted, graded and shaped. A two-inch thick asphalt surface will be placed on the stabilized base material. Ancillary work includes traffic control, and replacement of existing pavement markings. Each bid shall be accompanied by a bid guarantee in the form of acertified check, cashiers check,or acceptable Bid Bond, payable to City of Hunters Creek Village in an amount not less than 5% of the maximum Bid price submitted, as a guarantee that the bidder will enter into a contract within Ten (10) days after receipt of the contract documents. The right is reserved, as the interest of the Authority may require, to reject any and all bids and/or to waive any informality in bids received. The Work in this project includes the following: "City of Hunters Creek Village - Beinhorn Road Reconstruction" 1. The project is located on Beinhorn Road from Hedwig Road to Kuhlman Road and on Wade Hampton Drive from Beinhorn to 12 Oaks Drive. a. On Beinhorn Road, the work primarily consists of the in-place recycling of existing pavement materials and a 2-inch thick asphalt overlay. Ancillary work includes, traffic control and pavement markings. b. Pulverize the existing paving materials 10 inches deep. c. Treat the pulverized material with Tru Bln at 50 lbs per SY, mix and compact. d. Grade the stabilized material to shape at an elevation 2inches lower than the existing roadway. Overlay the roadway with 2 inches of asphalt surface mix. e. On Wade Hampton Drive, the work primarily consists of milling the surface 2 inches deep and placement of a 2-inch thick Type D asphalt overlay. 2. Adhere to traffic control plan, including proper signage and barricade placement, as shown in plans. 3. Clean up work area and properly dispose of all waste resulting from construction. 4. Replace any items damaged as a result of construction. 1.03 WORK SEQUENCE A. Phase 1 shall consist of the reconstruction of Beinhorn Road, from Voss to Kuhlman and the overlay of Wade Hampton Drive. The Phase 1 reconstruction of Beinhorn does not include the milling and overlay of roadway transitions on Storywood Drive, Flint River Drive, and Country Lane or any driveway transitions. B. Phase 2 shall consist of the reconstruction of Beinhorn Road from Voss to Hedwig Road, and the milling and overlay of all roadway transitions, driveways, and driveway transitions. C. The CONTRACTOR is required to determine his own method of construction and detailed work sequence in coordination with the City Engineer so long as the restraints are observed and the overall project completion time is achieved (identified in the Contract Documents).

Award

Roads / Highways

$414,590.00

Public - City

Paving, Site Work

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
56
Bidding Soon
2,736
All Active Projects
1,120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2021

August 20, 2021

img_map_placeholder

Beinhorn Rd, Piney Point Village, TX

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.