Published September 21, 2021 at 8:00 PM
Updated November 15, 2023
Demolition, site work and new construction of a detention facility in Stanley, Wisconsin. Completed plans call for the demolition of a detention facility; for the construction of a detention facility; and for site work for a detention facility.
Rebid for Fire Protection only. Low Bidders : Certified, Inc. Altoona, WI Combined Bid: Plumbing Base Bid No. 3 and HVAC Base Bid No. $ 4 113,965.00 Hudson Electric, Inc. Chippewa Falls, WI Electrical Base Bid No. $ 5 25,900.00 Total= $ 139865.00 This project is being let using a new single prime bidding and contracting process. DFD will publicly 26 bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 27 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each 28 applicable MEP division of work. These successful MEP bids must be included in all general prime contractor 29 bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open 30 general prime contractor bids. General prime contractor bids that do not include the successful MEP 31 bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, 32 certified general prime contractor and this general prime contractor will enter into subcontracts with the 33 successful MEP bidders. In general the work consists of the general interior demolition and remodeling of 1,400 square feet of Ground Floor, including Concrete Footings and Slab-on-grade, Masonry and Gypsum Board partitions, Precast Concrete Hollow Core Planks, Structural Steel Framing, Hollow Metal Doors and Hardware (including Detention type), Cabinetry, Plumbing, HVAC, Electrical, and Fire Protection. Bidder shall identify the division of work they are bidding on when requesting Bidding Documents online. 3 Base Bids will be received as a single lump sum bid for: 2) Fire Protection (Fire Suppression); 3) 4 Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's 11 prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state 12 building projects no longer apply. These changes take effect for projects advertised for bid after 13 September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bid Result : HVAC BASE BID NO. 4 - Wisconsin Mechanical Solutions - 55,900.00 ELECTRICAL BASE BID NO. 5 - Hudson Electric, Inc - 25,900.00
Bid Results
Jails / Prisons
$382,515.00
Public - State/Provincial
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.