Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 19, 2024 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Cedar Falls, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
This project generally consists of the installation of a roundabout at the intersection of Viking Road and Prairie Parkway, storm sewer, sidewalk, and landscaping within the roundabout center island. Site Address: Intersection of Prairie Pkwy & Viking Rd Bid Security: Bidders shall provide a bid security in the amount defined in the Instructions to Bidders- Division 1 Section 05. A scanned copy of the Bid Bond must be included with the online The successful Bidder shall furnish to the City a performance bond in an amount equal to one hundred percent (100%) of the contract price, guaranteeing faithful performance of the contract and guaranteeing the completed project against defective workmanship and materials for a period of two (2) years from and after completion and acceptance by the City. The successful Bidder shall also provide a payment bond in an amount equal to one hundred percent (100%) of the contract price guaranteeing payment of all persons supplying labor and materials, or both, in the execution of the work provided for in the contract. If any prospective bidder is in doubt as to the true meaning of any parts of the contract documents, the bidder may request an interpretation from the Engineer, in writing, through email. Questions received less than five (5) days prior to the date for opening bids may not be answered. Ben Claypool, PE, PhD City of Cedar Falls Department of Public Works 220 Clay Street Cedar Falls, IA 50613 Benjamin.Claypool@cedarfalls.com The work under the proposed contract shall commence within ten (10) calendar days after the date set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project.Contractor shall fully complete the project no later than September 12th, 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids. If any prospective bidder is in doubt as to the true meaning of any parts of the contract documents, the bidder may request an interpretation from the Engineer, in writing, through email. Questions received less than five (5) days prior to the date for opening bids may not be answered. Contact individuals shall be as follows: Ben Claypool, PE, PhD City of Cedar Falls Department of Public Works 220 Clay Street Cedar Falls, IA 50613 Benjamin.Claypool@cedarfalls.com
Award
Roads / Highways
$2,217,803.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2024
October 9, 2024
Prairie Pkwy & E Viking Rd, Cedar Falls, IA
Related To This Project
Cedar Falls, IA
Bid Date: Aug 09 2024
Cedar Falls, IA
Bid Date: Jul 30 2024
Cedar Falls, IA
--
Cedar Falls, IA
--
Cedar Falls, IA
Bid Date: Aug 29 2024
Cedar Falls, IA
--
Cedar Falls, IA
--
Cedar Falls, IA
Bid Date: Jul 11 2024
Cedar Falls, IA
Bid Date: Jun 06 2024
Cedar Falls, IA
Bid Date: Jun 05 2024
Cedar Falls, IA
Bid Date: May 30 2024
Cedar Falls, IA
Bid Date: May 30 2024
Cedar Falls, IA
Bid Date: May 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.