BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Cedar Falls, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Contact individuals shall be as follows: Matthew Tolan Cedar Falls Engineering Department 220 Clay Street Cedar Falls, IA 50613 matthew.tolan@cedarfalls.com This Project involves seal coating five (5) street sections, one (1) single lane drive for a lift station, multiple single lane drives within three (3) cemeteries, and one parking lot; for a total covering of 46,400 S.Y. of seal coat. Work shall include proper surface preparation and proper placement and compaction of the surface. Est. Value: $ 235,266.90 Each Form of Proposal shall be accompanied in a separate envelope by a proposal guaranty as defined in Division 1 Section 05 Performance and Payment Bonds: The successful Bidder shall furnish to the City a performance bond in an amount equal to one hundred percent (100%) of the contract price, guaranteeing faithful performance of the contract and guaranteeing the completed project against defective workmanship and materials for a period of two (2) years from and after completion and acceptance by the City. The successful Bidder shall also provide a payment bond in an amount equal to one hundred percent (100%) of the contract price guaranteeing payment of all persons supplying labor and material, or both, in the execution of the work provide for in the contract. The work under the proposed contract shall commence within ten (10) calendar days after the date as set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project. All work shall be completed within twenty-five (25) working days. Working days will be accumulated concurrently from the date as set forth in the written Notice to Proceed. The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids.

Bid Results

Roads / Highways

$201,099.00

Public - City

Paving, Site Work

15

5

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
47
Bidding Soon
647
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 24, 2024

img_map_placeholder

Multiple Locations, Cedar Falls, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.