Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an elderly care / assisted living facility in Little Current, Ontario. Completed plans call for the construction of a 10,944-square-foot, one-story above grade, 12-unit elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.
https://www.manitoulin.com/dsb-will-move-ahead-to-construct-12-seniors-units-in-little-current/ Manitoulin Sudbury District Services Board (DSB) passed a motion at its November 25 board meeting to award the tender to build a 12-unit apartment complex to Capital Construction of Sudbury. The new facility will be constructed on land adjacent to Low Island that was donated by Lily Fielding to the Town of Northeastern Manitoulin and the Islands. The DSB board voted to move ahead with the project at a cost of $4,917,981 plus taxes. DSB CAO Fern Dominelli said he was pleased that the project was finally moving forward. There had been some concerns over the impact that the pandemic would have on costs going forward. "Prices were high," admitted Mr. Dominelli. "In the end it was decided to move forward." It is hoped that construction can move forward "as soon as possible," said Mr. Dominelli. "The board has authorized the awarding of the tender, but we still have to sit down with the contractor and work out the details and the signing of the contracts." Still, Mr. Dominelli was optimistic that shovels could be going in the ground this fall. With waiting lists for affordable seniors' housing sitting around 40 applicants back in the spring, and with little to no abatement in demand, the sooner new residences can be made available the better. "We have to credit the Lilly Fielding Foundation for the donation of the land," said Northeast Town Mayor Al MacNevin. "If it were not for that donation, we would not be in a position to have provided it to the DSB." "This is great for the community and great not just for NEMI, but for the whole Island," continued Mayor MacNevin. "There are a lot of seniors who are looking for housing. This took a long time coming, but with the DSB project, it is a definite win for us and a win for seniors. We weren't sure with construction prices the way they are whether it would be going ahead." The DSB motion was moved by Vern Gorham and seconded by Ted Lovelace and reads: "Whereas the property committee has reviewed the tender results for the new seniors' apartment complex in the Town of Northeastern Manitoulin and the Islands in Little Current; and whereas the property committee is recommending that the Board proceed with the construction and award the tender; therefore be it resolved that the Manitoulin-Sudbury DSB accepts the property committee's recommendations and awards the tender to Capital Construction in the amount of $4,917,981 plus applicable taxes. Further be it resolved the Manitoulin-Sudbury DSB finance the construction of the new build from our current accounts." -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Work of this Contract involves the construction and commissioning of the new Senior's Residence Complex located in the Township of NEMI found on the intersection of Water Street West and Park Street in Little Current Ontario. The new facility will be constructed on a green field property. The facility will consist of three four-plex buildings that are single story slab on grade. The facility will be a mix of single and two-bedroom units (12 units in total). Documents can be obtained at: https://hscorp.bonfirehub.ca/opportunities/45891
Award
Elderly Care / Assisted Living
$4,917,981.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2021
November 15, 2021
Water St W & Park St, Little Current, ON
Related To This Project
Little Current, ON
Bid Date: Mar 22 2019
Little Current, ON
Bid Date: Mar 31 2022
Little Current, ON
--
Little Current, ON
Bid Date: Jan 14 2022
Little Current, ON
Bid Date: Mar 15 2022
Little Current, ON
--
Little Current, ON
Bid Date: Jan 21 2022
Little Current, ON
Bid Date: Jan 21 2022
Little Current, ON
Bid Date: Mar 31 2022
Little Current, ON
Bid Date: Mar 31 2022
Little Current, ON
Bid Date: Apr 07 2022
Welland, ON
--
Brampton, ON
--
Pickering, ON
--
Brampton, ON
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.