BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2021 at 8:00 PM

Updated May 9, 2025

Site work for a bridge / tunnel in Washington, Illinois. Completed plans call for site work for a bridge / tunnel.

**As of September 15, 2021, this project has been awarded to Stark Excavating in the amount of $213,534.70. Project Consists of Removal O an Existing Cast-in-place Box Culvert and Replacement With a 12'x4'x42- 7 3/4" Cst-in-place Box Culvert With Concrete Wingwalls, Sidewalk, Riprap, and Other Collateral Work. Project Location: North St. (East of Main St.) Over Drainage Ditch Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Removal of an Existing Cast-in-place Box Culvert 21-00131-00-DR

Award

Bridges / Tunnels

$213,535.00

Public - City

Site Work

15

6

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
90
Bidding Soon
1,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2021

August 26, 2021

Project location map

North St, Washington, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.