EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 25, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Pleasanton, California. Completed plans call for the renovation of a educational facility.

Pleasanton Unified School District ("District") is seeking proposals from qualified persons, firms, partnerships, corporations, associations, or professional organizations ("Respondent") to provide design, constructability review, value engineering, master scheduling, cost estimating, budgeting, pre-construction and construction services for the development and construction for the: HART MIDDLE SCHOOL PORTABLE REPLACEMENT & NEW SCIENCE CLASSROOMS, PACKAGE 2 INCREMENT 2: MODULAR BUILDING Project ("Project"), in accordance with the lease-leaseback structure set forth in Education Code section 17406 et seq. The responsibilities of the respondent will include but not limited to the following scopes and services at the various stage of the project: Design & Pre-construction: Respondent with the input of the District and design team will create drawings and specifications for a modular classroom building based on the criteria documents enclosed in the RFQ/P packet. These documents will be submitted to the Division of State Architect ("DSA") for review by the Respondent after approval by the design team. Construction: After stamped and approval by DSA, the Respondent will be responsible for the complete construction of the modular building. The construction will match and/or exceed the expectations and specifications as detailed per the stamped project plans. The Request for Qualifications and Proposals ("RFQ/P"), which includes instructions for its completion, is enclosed for your consideration. Respondents to this RFQ/P shall submit a completed Statement of Qualifications ("SOQ") along with the Proposal (collectively "RFQ/P Packet"). The District will only receive RFQ/P Packets submitted electronically. Any RFQ/P Packet that is submitted after this time shall be nonresponsive and returned to the bidder. Each respondent is solely responsible for timely submission of its RFQ/P Packet; the District is not responsible for any technological issues in a respondent's ability to timely submit its RFQ/P Packet or portion thereof. Questions regarding this RFQ/P may be directed to the construction manager: MINH DAO minh.dao@vpcsonline.com and must be submitted in writing on or by 2:00 P.M. ON THURSDAY, JULY 29 2021. All Respondents must have already been prequalified by the District in accordance with Public Contract Code, 20111.6. First tier electrical, mechanical and plumbing subcontractors are required by Public Contract Code, 20111.6 and must be prequalified prior to subcontractor bids are submitted. Contractors of all tiers must be currently registered and qualified to perform public work pursuant to Labor Code, 1725.5. The District reserves the right to change the dates on the schedule without prior notice. RFQ/P SCHEDULE SUMMARY DATE ACTION ITEM July 09, 2021 Release and advertisement of RFQ/P #2021-22.01. July 09, 2021 RFQ/P packages available for distribution. July 16, 2021 2:00 P.M Last day to receive written questions from Respondents. August 02, 2021 by 2:00 P.M. Last day for District to issue addenda to answer questions/ clarifications. August 05, 2021 by 2:00 P.M. Deadline for submissions in response to RFQ/P #2021-22.01. Week of August 09, 2021 Release of shortlist qualified Respondents and interview (TENTATIVELY) notifications. Week of August 16, 2021 Interviews of qualified Respondents. (TENTATIVELY) Week of August 16, 2021 Notice to selected developer. (TENTATIVELY) PT/VT #6590280

Post-Bid

Educational

$4,000,000.00

Public - City

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Entrances and Storefronts, Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Integrated Construction, Building Modules
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Storage, Storage Equipment and Systems, Storage Cabinets

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
91
Bidding Soon
2,032
All Active Projects
849
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2021

May 9, 2022

img_map_placeholder

4433 Willow Rd, Pleasanton, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.