BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a mixed-use development in Corpus Christi, Texas. Completed plans call for the demolition of a military facility; for the construction of a 163,025-square-foot, two-story above grade military facility; and for site work for a military facility.

The project is for reconstruction of the two-level command suite and administrative office area at the south end of warehouse Building DDCT-01846 due to extensive water damage to finishes and systems including the provision of temporary facilities (temporary trailers) to support displaced DDCT personnel during the period of construction. In response to review comments by the NAS Corpus Christi Fire Protection AHJ, planned fire protection system repairs and upgrades for Building DDCT-01846 are included in the scope of the project. The goal of this design is to improve the functionally and serviceability of the office area, as well as address life safety and code deficiencies with the fire protection systems. Modifications to the existing two-level office layout are needed to meet current and future mission requirements. Due to the extensive renovation required to address Hurricane Harvey storm damage, reconfiguration of the two-level office space is included in the scope of work for this project, as well as several non-compliant code issues that were identified as part of the facility condition assessment. The scope of work generally includes the selected abatement of asbestos-containing materials; reconfiguration of interior spaces; upgrading electrical, mechanical, telecommunications, security, fire suppression and alarm systems; providing code-required occupancy separation between the office area and warehouse; rebuilding the west stair for code compliance ; replacement of warehouse mechanical units and support platforms, and construction of a fire pump room building addition; and office swing space during construction provided in temporary trailers. Interior spaces include open offices areas; private offices; a break room and shelter-in-place; conference rooms; a classroom; a command suite; restrooms; and related support spaces. The existing fire suppression systems, fire alarm and mass notification systems in the warehouse shall be completely demolished and replaced with new. The project magnitude is between $5,000,000 and $10,000,000; and contains a period of performance of 480 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$10,000,000.00

Public - Federal

Demolition, New Construction, Site Work

127

33

20

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
13
Bidding Soon
199
All Active Projects
82
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2021

October 7, 2021

img_map_placeholder

308 3rd St, Corpus Christi, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.