EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 31, 2021 at 8:00 PM

Updated March 15, 2024

Site work for a water / sewer project in Vancouver, Washington. Completed plans call for site work for a water / sewer project.

This project has been awarded to Construction Services Group LLC in the amount of $159,961. The Terminal 5 Northwest Exit Improvements Project reconfigures the existing fenced perimeter exit by installing a 60' motorized gate, a 30' swing gate, two 15' swing gates modifying the existing fence, additional fencing and electrical improvements for the motorized gate. This project widens the exit corridor to facilitate a wider swing radius for longer truckloads. The amount of the bond or cashier's check shall be not less than five percent (5%) of the total amount bid and may be shown in dollars or on a percentage basis.: The Contractor agrees that for projects of $35,000 or more, before it undertakes performance of the Contract, it will file with the Port a Performance and Payment Bond in the full amount of the Contract price, executed by itself as a principal and one or more surety companies authorized to do business in the State of Washington as surety. The bond shall be supplied on a Port of Vancouver approved form. The cost estimate for the project is $63,755 - $70,105 Clarification Deadline: 7/29/2021 12:00 PM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$159,961.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceramic Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
29
Bidding Soon
660
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2021

September 6, 2021

img_map_placeholder

3103 NW Lower River Rd, Vancouver, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.