BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Site work and paving for a road / highway in Pincher Creek, Alberta. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Upgrading of 45 kilometres of Highway 3 from West of Twp. Rd. 70 at Pincher Creek to East of Highway 810 in Fort MacLeod to a full freeway. Highway 3:04 from Km 27.0 (west of TWP RD 70) to Highway 3:06 Km 43.2 (East of Highway 810). TIMELINE: Functional planning study is ongoing. Scope of work consists of developing a functional plan for the staged upgrading of Highway 3 into a twinned expressway and then ultimately into a full freeway with interchanges. Design, tender and construction timelines are yet to be determined. Further update may be available in 2026. *Budget to be confirmed.

Conceptual

Roads / Highways

$15,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
130
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2031

Project location map

AB-3, Pincher Creek, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.