Published September 29, 2022 at 8:00 PM
Updated October 24, 2023
Site work and paving for a sidewalk / parking lot in Pincher Creek, Alberta. Completed plans call for site work for a sidewalk / parking lot.
1. Mobilization: - Trail system maintenance in the Castle / Pincher area will typically require a dedicated crew working a 40 hour week. There may be instances where specific trail needs may require a modified schedule and camping at remote sites. Sign installations will be at a number of locations throughout the system. As regular maintenance is key a circuitous route will be required from mid to late May through mid-September. 2. Castle / Pincher scope - Please see Attachment 4, which identifies the trail systems in question. Please note that signage installation locations will be provided at the start up meeting and throughout the summer. Further note that most work will take place in or between mountainous terrains. 3. Documentation - Weekly reports regarding progress will be required. In the case of a reported trail hazard, Parks contract manager will update the contractor as soon as possible. The contractor will provide Parks with a summary report at the conclusion of the contract. 4. Geographic area - All non-motorized trails for maintenance work, including tree clearing, mowing, etc. will occur within Castle Provincial Park and Wildland Provincial Park, as identified on our Summer Map 2022. Beauvais Lake Provincial Parks' trails will also be to be included. Signage Installation - Syncline Trail Network Maintenance and Wayfinding Signage is a top priority. Signage installation for wayfinding will be required on a number of identified trails. Proper signage installation and Alberta One-Call will be required. Signage cannot be affixed to trees. A priority list will be provided once the contract is awarded. The objective of this project is two-fold: one, the timely removal of trail hazards and trail repair to reduce the risk of injury to users; two, the installation of informational signage along the trail system in the SW area of Alberta Parks.
Award
Sidewalks / Parking Lot
$67,500.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2022
July 25, 2022
Multiple Locations, Pincher Creek, AB
Related To This Project
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Mar 14 2023
Pincher Creek, AB
Bid Date: Dec 08 2023
Pincher Creek, AB
Bid Date: Mar 31 2023
Pincher Creek, AB
Bid Date: Apr 21 2023
Pincher Creek, AB
Bid Date: Apr 12 2023
Pincher Creek, AB
Bid Date: Mar 23 2023
Pincher Creek, AB
Bid Date: Sep 01 2022
Pincher Creek, AB
Bid Date: Jun 30 2022
Pincher Creek, AB
Bid Date: Feb 15 2019
Pincher Creek, AB
Bid Date: Jul 11 2019
Pincher Creek, AB
Bid Date: Jul 28 2022
Pincher Creek, AB
Bid Date: Jul 26 2022
Pincher Creek, AB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.