Published March 3, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a civil project in Randolph, Nebraska. Completed plans call for site work for a water / sewer project; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Contract Award Date: Mar 01, 2022 Contract Award Number: W9128F22C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 968786520 Contractor Awarded Unique Entity ID (SAM): SSL9LF1Z6LM6 Contractor Awarded Name: Iron Mike Construction Llc Contractor Awarded Address: Centennial, CO 80112-3922 USA Base and All Options Value (Total Contract Value): $7996440.40 The flood risk reduction project is along the Middle Logan Creek inA Randolph, Nebraska. The work reach extends fromA approximately 550-feetA upstream of County Line Road (558th Ave) to 150 feet upstream of SholesA Road bridge. The work in general comprises: 1) Earthwork/grading for the realigned and widened Middle Logan Creek channel -excavating existing channel to a widened channel bottom of 40 feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot deep low flow channel. 2) Transition from natural channel approximately 400 feet upstream of 558th Ave bridge to the trapezoidal widened channel section. 3) Channel improvements with erosion and grade control, placement of new riprap, and other erosion control include turf reinforcement mat, seeding, erosion control blanket, silt fence, etc. 4) New and extended storm drain structures. 5) Removal and replacement of Main St., Douglas St., and 558th Ave bridges. 6) Removal of a 42-foot long pedestrian bridge, not to be replaced. 7) Horizontal roadway realignment for Main St. bridge and vertical roadway realignment for the approaches to Main St., Douglas St. and 538th Ave bridge. 8) Shoo flybridge detour for 558th Ave bridge construction. 9) New 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; and 10) Installation of a new sanitary sewer siphon system and four domestic waterlines. Site Visit has been scheduled for Tuesday, 27 July 2021 at 10:00 am local time. Participants will meet at 212 East Broadway, Randolph, NE (City Offices of Randolph). Contractors interested in seeing the site need to make reservation with Todd Tobias telephone (402) 650-0358 or by e-mail at Todd.R.Tobias@usace.army.mil. The flood risk reduction project is along the Middle Logan Creek in Randolph, Nebraska. The work reach extends from approximately 550-feet upstream of County Line Road (558th Ave) to 150 feet upstream of Sholes Road bridge. The work in general comprises: 1) Earthwork/grading for the realigned and widened Middle Logan Creek channel - excavating existing channel to a widened channel bottom of 40 feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot deep low flow channel. 2) Transition from natural channel approximately 400 feet upstream of 558th Ave bridge to the trapezoidal widened channel section. 3) Channel improvements with erosion and grade control, placement of new riprap, and other erosion control include turf reinforcement mat, seeding, erosion control blanket, silt fence, etc. 4) New and extended storm drain structures. 5) Removal and replacement of Main St., Douglas St., and 558th Ave bridges. 6) Removal of a 42-foot long pedestrian bridge, not to be replaced. 7) Horizontal roadway realignment for Main St. bridge and vertical roadway realignment for the approaches to Main St., Douglas St. and 538th Ave bridge. 8) Shoo flybridge detour for 558th Ave bridge construction. 9) New 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; and 10) Installation of a new sanitary sewer siphon system and four domestic waterlines. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated magnitude of construction is between $5,000,000 and $10,000,000.

Award

Water / Sewer

$7,996,440.00

Public - Federal

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
35
Bidding Soon
441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2021

October 19, 2021

Project location map

Multiple Locations, Randolph, NE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.