Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 4, 2021 at 8:00 PM
Updated January 26, 2024
Site work for a pre-engineered storage facility in Madisonville, Kentucky. Completed plans call for site work for a pre-engineered storage facility.
https://www.the-messenger.com/news/local/article_25a0913c-c89a-56cc-96e8-fec9cf56f256.html Updated Aug 13, 2021 The Madisonville City Council approved a bid at a special called meeting on Wednesday for the Mahr Park Arboretum Event Barn B renovations in the amount of $169,876, coming in just under the target budget of $170,000. Madisonville Mayor Kevin Cotton said the bid originally came back in at $241,200 from only one bidder, Garrigan Construction, after adding on some items for the project. Cotton said the Madisonville Tourism City Council Committee and Tourism Advisory Board approved $100,000 for the project with the council picking up the additional $70,000 from the general fund. "The changes were minimal," said Cotton. "There were some additions to the building packet such as ramps, sidewalks and nice entry doors on the north side of the building that are there for convenience as much as they are anything else." Cotton also said the changes were to build a door on the interior of the barn on the west side along with a building on the exterior on the east side that would be an open hallway leading toward the restroom areas. Cotton said costs of building materials have increased since this project was originally started a year ago. "The cost of metal has gone up from when we originally started working on this project a year ago, so that is why there is an increase in the cost," said Cotton. He said that another major change was changing the HVAC system. "Instead of using mini split units in the HVAC system, we talked with Frank Wallace and Duke Gaston about the HVAC piece of that and they did in fact mention that the heat pump would save roughly $4,000," he said. "Garrigan's bid ended at $154,276 and the city is taking on the sealing of the concrete and other work. The total price to Garrigan would be $154,276 and the total would be $169,876 with the city expenses." A goal for the Event Barn B was to have it completed by Sept. 17 when the city plans to host a Harvest Festival. "We did push to have this completed before the Sept. 17 event, however, it will not be 100% complete but there will be enough movement on the project," Cotton said. "They said they could start as early as next week if it is approved today." _________________________________________________________ This project consists of supplying all material and labor for modification of Mahr Park Barn B at Mahr Park, 465 Mahr Park Road in Madisonville, KY. Bidding Documents may be reviewed on or after Friday July 23, 2021 at the office of the City Clerk, 67 North Main Street, Madisonville, Kentucky. Each proposal must be accompanied by a Bid Bond on the form contained in the proposal. This bond must be from a Surety Company acceptable to the City of Madisonville. Alternatively, bidders may provide a cashiers check or certified check made payable to the City of Madisonville, for not less than 5 percent of the total amount of the bid.A performance bond and a separate payment bond each in the amount of 100% of the contract price with a corporate surety approved by the owner will be required for the faithful performance of the contract. No bidder may withdraw his bid within 120 days after the actual date of the opening thereof. Attention is called to the fact that the Contractors must ensure that employees and applicants for employment are not discriminated against because of race, creed, color, religion, national origin, and sex or handicap status. If any person contemplating the submission of a bid for the proposed work is in doubt as to the true meaning of any part of the plans, specifications or proposed Contract Documents, he should submit a written request for any interpretation thereof to: Duke Gaston Gaston Engineering PSC 5225 Hanson Road Madisonville, KY 42431 Tel (270) 821-9366 dukegastoneng@att.net The owner may waive any informalities or minor defects or reject any and all Bids
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$169,876.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2021
September 8, 2021
465 Mahr Park Rd, Madisonville, KY
Related To This Project
Madisonville, KY
Bid Date: Mar 27 2023
Madisonville, KY
Bid Date: Apr 06 2023
Madisonville, KY
Bid Date: Apr 18 2023
Madisonville, KY
Bid Date: Apr 18 2023
Madisonville, KY
Bid Date: Apr 18 2023
Madisonville, KY
Bid Date: Sep 26 2018
Madisonville, KY
Bid Date: Apr 27 2023
Madisonville, KY
Bid Date: Apr 27 2023
Madisonville, KY
Bid Date: Apr 03 2023
Madisonville, KY
Bid Date: Feb 09 2023
Madisonville, KY
Bid Date: Feb 13 2023
Madisonville, KY
Bid Date: Sep 16 2022
Madisonville, KY
Bid Date: Dec 29 2022
Madisonville, KY
Bid Date: Mar 07 2023
Madisonville, KY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
