BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2021 at 8:00 PM

Updated September 15, 2023

Site work for a transportation facility in Buckeye, Arizona. Completed plans call for site work for a transportation facility.

Last Day for Questions: August 23, 2021 at 5:00pm This project will replace the existing airport beacon and obstruction light, repaint the beacon tower and platform and install all necessary cable in existing conduit, more particularly defined in Sections 500 and 600, Special Provisions and Construction Plans attached hereto. Last Day for Questions: August 23, 2021 @ 8:00 am The City of Buckeye is seeking sealed Bids for Buckeye Municipal Airport Beacon Replacement. Location of the Project: City of Buckeye Municipal Airport All contractors engaged in City of Buckeye construction shall be licensed in the State of Arizona The Bidder is required to email and then submit through mail a certified or cashier's check, upon a solvent bank, or a surety bond in an amount equal to ten percent (10%) of the Base Bid made payable to the City of Buckeye. The bid security shall be given as a guarantee that the Bidder will enter into the Contract if awarded to him; and shall be declared forfeited as liquidated damages if he refuses to enter into said contract upon request to do so by the City. The Bid security other than bid bonds will be returned to the unsuccessful bidders and to the successful bidder upon his execution of a satisfactory payment and performance bond, and contract. Failure by the Bidder to submit bid security will result in rejection of the Bid as nonresponsive All bids must also include a list of sub-contractors being proposed for this project. A Subcontractor List is attached hereto as Attachment 2. The Contractor to whom the Contract is awarded shall, after being awarded the Contract, furnish to the City with a fully executed Contract a satisfactory performance and payment bond in an amount equal to one hundred percent (100%) of the full amount of the Bid, such bond not to be expressly limited as to time in which action may be instituted against the surety company for possible nonperformance of the Contractor. Work shall commence immediately after the issuance of the Notice to Proceed and shall be completed within Thirty (30) calendar days from the date established by such Notice. Subject to the provisions of the City's Procurement Code, the City reserves the right to reject any or all Bids, to waive or decline to waive irregularities in any bid, or to withhold the award if the City determines it to be in the best interests of the City. All correspondence relating to this Project should be addressed to: Debby Fasano Contracting Officer, Construction and Contracting City of Buckeye 530 East Monroe Avenue Buckeye, Arizona 85326 P: 623.349.6174 Email: dfasano@buckeyeaz.gov

Award

Transportation Terminals

$32,872.00

Public - City

Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
52
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2021

October 1, 2021

Project location map

3000 S Palo Verde Rd, Buckeye, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.