BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Buckeye, Arizona. Completed plans call for the renovation of a municipal facility.

2022026 The Construction Budget is $150,000.00. Last Day for Questions: August 22, 2022 at 5:00pm The City of Buckeye has a need to upgrade the finishes in the existing Chamber of Commerce Building. To facilitate this project the city has reviewed the attached sketch up documents that provide the concept they are looking for. All contractors engaged in City of Buckeye construction shall be licensed in the State of Arizona. All correspondence relating to this Project should be addressed to: Pat Glasmann Contracting Officer, Finance Department City of Buckeye 530 East Monroe Avenue Buckeye, Arizona 85326 P: 623.349.6173 Email: pglasmann@buckeyeaz.gov The Bidder is required to email and then submit through mail a certified or cashier's check, upon a solvent bank, or a surety bond in an amount equal to ten percent (10%) of the Base Bid made payable to the City of Buckeye. The bid security shall be given as a guarantee that the Bidder will enter into the Contract if awarded to him; and shall be declared forfeited as liquidated damages if he refuses to enter into said contract upon request to do so by the City. The Bid security other than bid bonds will be returned to the unsuccessful bidders and to the successful bidder upon his execution of a satisfactory payment and performance bond, and contract. Failure by the Bidder to submit bid security will result in rejection of the Bid as nonresponsive. If a surety bond is used as bid security it shall be executed on the form provided in Attachment 1 of the bid package. The surety bond provided as bid security shall be executed solely by a surety company or companies holding a certificate of authority to transact surety business in this state issued by the Director of the Department of Insurance pursuant to Title 20, Chapter 2, Article 1. The surety bond shall not be executed by an individual surety or sureties. All bids must also include a list of sub-contractors being proposed for this project. A Subcontractor List is attached hereto as Attachment 2. The Contractor to whom the Contract is awarded shall, after being awarded the Contract, furnish to the City with a fully executed Contract a satisfactory performance and payment bond in an amount equal to one hundred percent (100%) of the full amount of the Bid, such bond not to be expressly limited as to time in which action may be instituted against the surety company for possible nonperformance of the Contractor. Work shall commence immediately after the issuance of the Notice to Proceed and shall be completed within Seventy (70) calendar days from the date established by such Notice. Subject to the provisions of the City's Procurement Code, the City reserves the right to reject any or all Bids, to waive or decline irregularities in any bid, or to withhold the award if the City determines it to be in the best interest of the City. Mistakes discovered before bid opening may be modified or withdrawn by written notice received by the City prior to the time set for bid opening. After bid opening corrections in bids shall be permitted only to the extent that the bidder can show by clear and convincing evidence that a mistake of a nonjudgmental character was made, the nature of the mistake, and the bid price actually intended. After bid opening, no changes in bid prices or other provisions of bids prejudicial to the interest of the City or fair competition shall be permitted. In lieu of bid correction, a low bidder alleging a material mistake of fact may be permitted to withdraw its bid if: (a) the mistake is clearly evident on the face of the bid document, but the intended correct bid is not similarly evident; or (b) the bidder submits evidence that clearly and convincingly demonstrates that a mistake was made. All decisions to permit the correction or withdrawal of bids, or to cancel awards or contracts based on bid mistakes, shall be supported by a written determination by the City Manager.

Award

Municipal

$267,290.00

Public - City

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
11
Bidding Soon
686
All Active Projects
242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 10, 2022

img_map_placeholder

508 Monroe Ave, Buckeye, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.