Published October 21, 2021 at 8:00 PM

Updated August 8, 2024

Site work for a civil project in Escondido, California. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

The SPUP will remove, relocate, and replace approximately 2.5 miles of the Escondido Canal that cross the San Pasqual Indian Reservation. The SPUP consists of three major components: desilting basin, replace in place section, and pipeline section. These components are further described below. Desilting Basin - (110 long x 32 wide) hydraulic structure within the 100-foot canal right-of-way will require the construction of large retaining walls and an all-weather access road, which includes a concrete box tunnel. Replace in Place Section - The first half mile of open canal will be replaced with a shallowly buried 60-inch wide by 48-inch high precast concrete box culvert. Pipeline Section - The box culvert will transition to buried, 60-inch diameter pipeline in a new 1.5 mile long alignment across portions of the San Pasqual Indian Reservation, easements across private parcels, and the public right-of-way in North Lake Wohlford Road. To minimize environmental impacts to a riparian area in this section, the pipeline will be constructed within a 350-foot long tunnel. Liquidated Damages: $2,500.00 Per Calendar Day Bid Bond Percentage: 10% Project Duration: 400 Calendar Days License Type Required: A Construction of a 4,450 square foot desilting basin and associated access road at the northern/upstream end of the Replace-in-Place Section on the San Pasqual Reservation. Replacement of the existing canal with a 48"x 60" inside dimension box culvert (Replace-in-Place Section). Installation of approximately 1.6 miles of 60-inch diameter tapewrapped cement mortar lined and coated welded steel underground pipeline. This includes surface restoration in undeveloped areas and roadways, cleanout structures, and pipe appurtenances. This also includes a section of pipe installed via tunneling underneath an open space easement.

Award

Water / Sewer

$31,712,890.00

Public - City

Site Work

97

20

13

16

Subscribe For Documents

126 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
191
Bidding Soon
2,518
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

November 15, 2021

Project location map

San Pasqual Rd, Escondido, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.