BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project; and road / highway.

Construction of Storm Sewer, Detention Excavation and Mass Grading Scope of Work of the Contract includes the following: Construction of Detention & Mass Grading for Balmoral East. Contractor further agrees that Owner may make such changes and alterations as Owner may see fit in the line, grade, form, dimensions, Plans, Technical Specifications, or materials for or scope of the Work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this Contract and the accompanying Bonds. If such changes or alterations diminish the quantity of the Work to be done, such changes may reduce the Contract Price according to the quantity of Work actually done and the unit price established for such Work under this Contract and shall not constitute the basis for a Claim. If such changes or alterations increase the amount of Work and the increased Work can fairly be classified under the Plans, Technical Specifications, or other Contract Documents, such increase shall be paid for according to the quantity of Work actually done and at the unit prices established for such Work under this Contract, otherwise such Extra Work shall be paid for as provided in this Article. If Owner makes such changes or alterations as makes useless any Work already done or materials already furnished or used in accordance with the Contract Documents in connection with said Work, then Owner shall recompense Contractor for such Work, labor and materials, in accordance with the prices therefore in the Contract Documents, made useless by such change. The project is located in Harris County Municipal Utility District No. 422 in Harris County, Texas. The site lies on the west side of West Lake Houston Parkway just to the north of Summer Lake Ranch Subdivision.

Bid Results

Water / Sewer

$1,291,703.00

Public - County

Site Work

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2021

September 14, 2021

img_map_placeholder

To Be Determined, Houston, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.