BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Winter Park, Florida. Completed plans call for site work for a water / sewer project.

The work on this project shall include the following: 1. Deepening of the existing Well S-1 at the South WTP from 490 feet to 1,200 feet below land surface; installation of an 8-inch casing to extend the well casing depth from 184 feet to 600 feet below land surface; and drilling of an 8- inch open hole to 1,200 feet below land surface. . 2. A new well pump to replace the existing Well No. S-1 pump. The replacement pump is to be installed at the existing pump pad and pedestal and connected to existing well discharge piping and valves. 3. A new pump starter in MCC-1. 4. A new local pump switch. 5. New electrical conduit and wiring feed from the pump starter to the local switch. All contract time lines will be based on the project scope and the estimated time for performance. The successful Bidder shall have this project attain substantial completion no later than One Hundred Fifty (150) consecutive calendar days after issuance of the Notice to Proceed and/or the City issued Purchase Order date and final completion no later than Thirty (30) consecutive calendar days after substantial completion date. This project is to improve the water quality of the City's South Water Treatment Plant (WTP) Well S-1 located at 1890 Casselton Drive, Casselberry, Florida 32707 by deepening the well to match the depth of the WTP's two (2) other production wells. The Work consists of furnishing all labor, equipment, and materials for the construction of the facilities. Piggyback Solicitation No Insurance Required Yes Bid Bond Required Yes Performance Bond Required Yes Broadcast Date 8/9/2021 8:00 AM Question End Date 8/26/2021 5:00 PM Anticipated Award Date 9/27/2021 The City reserves the right to waive any and all technicalities, formalities and to reject any or all bid submittals or to re-advertise for bid submittals for these commodities/services. The City may withdraw all or part of this ITB at any time to protect the interests of the City. Thank you for your interest in doing business with the City of Casselberry, Florida.

Award

Water / Sewer

$716,745.00

Public - City

Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
160
Bidding Soon
2,524
All Active Projects
1,028
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 16, 2021

October 18, 2021

April 9, 2022

img_map_placeholder

1890 Casselton Dr, Winter Park, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.