BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to an educational facility in Bishop, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

The project consists of an addition to an existing building, concrete foundations, steel structure, CMU and brick veneer, TPO roofing, painting, ceramic tile, resilient flooring, acoustical ceilings, metal doors, wood doors and hardware installation, toilet partitions, installation of plumbing HVAC and electrical. Contract, if awarded, will be on the basis stated in the Instructions to Offerors. No proposal may be withdrawn for a period of 60 days after proposal opening. Proposals must be accompanied by a bid bond made payable to Oconee County School District, in the amount equal to 5 percent of the proposal price. (Certified Checks Not Acceptable.) The successful offeror will be required to furnish a Performance Bond and a Payment Bond acceptable to the Oconee County School District in an amount equal to 100 percent of the contract price and executed by a Surety Company licensedto do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A" with a financial size of VI "6" or better. Bonds must be accompanied by letter stating bonding company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Additionally, Oconee County School District requests that all responses be submitted in electronic form via flash/thumb drive or CD. PDF format is acceptable unless otherwise stated. Contractor and Subcontractors shall require the Attorney-in-Fact who executes bonds on behalf of sureties to attach a certified, current copy of his Power of Attorney. Oconee County School District reserves the right accept or reject any or all proposals and to waive technicalities and informalities. substantially complete all work on Addition by July 1, 2022..

Award

Educational

$2,756,000.00

Public - County

Addition, Demolition, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
16
Bidding Soon
1,432
All Active Projects
506
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2021

October 1, 2021

img_map_placeholder

401 Hopping Rd, Bishop, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.