Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 10, 2021 at 7:00 PM
Updated October 3, 2025
Site work and new construction of an educational facility in Litchfield, Illinois. Completed plans call for the construction of a 42,071-square-foot, two-story above grade educational facility; and for site work for a educational facility.
Construct new 42,071 square foot two-story elementary school including ICC 500 shelter gymnasium. Project consists of site clearing and excavation, structural concrete, concrete flatwork, precast concrete wall panels, masonry, structural and miscellaneous steel, rough carpentry, architectural woodwork, roofing, sheet metal, hollow metal doors and frames, aluminum storefront/curtainwall/glass & glazing, floor coverings, painting, metal stud framing and gypsum board walls, acoustical ceilings, wall graphics, casework and furniture, elevator, fire suppression, plumbing, HVAC, electric, and communications work. As of November 9th, 2021 a groundbreaking ceremony for this project was held on October 26th, 2021. A general contractor and architect have been confirmed. Construction work is expected to begin in the spring of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Bid-result Bid Package 3 Litteken Construction -$ 3,198,000.00 Bid Package 4 Toenjes Brick -$ 227,775.00 Bid Package 5 Litteken Construction -$ 3,198,000.00 Bid Package 6 Keher Brothers Roofing -$ 375,900.00 Bid Package 7 R&R Vision Glass- $ 190,884.00 Bid Package 8 George Weis Co. -$ 548,752.00 Bid Package 9 Flooring Systems - $ 367,780.00 Bid Package 10 Morissey Constracting Bid Package 11 Apex Fire Protection-$ 128,850.00 Bid Package 12 Stoops Plumbing-$ 392,800.00 Bid Package 13 Hensen Robinson- $ 979,180.00 Bid Package 14 Synergy Electric - $ 959,959.00 Bid Package 15 Gelly Excavation - $ 504,096.00
Bid Results
Educational
$7,971,976.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2021
April 4, 2022
127 W St John St, Litchfield, IL
Related To This Project
Litchfield, IL
Bid Date: Oct 27 2025
Litchfield, IL
Bid Date: Nov 07 2025
Litchfield, IL
Bid Date: Oct 27 2025
Litchfield, IL
Bid Date: Feb 27 2026
Litchfield, IL
--
Litchfield, IL
Bid Date: Dec 23 2025
Litchfield, IL
Bid Date: Jan 21 2026
Litchfield, IL
Bid Date: Jan 27 2026
Litchfield, IL
--
Litchfield, IL
Bid Date: Sep 09 2025
Litchfield, IL
Bid Date: Aug 13 2025
Litchfield, IL
Bid Date: Aug 21 2025
Litchfield, IL
Bid Date: Jun 24 2025
Litchfield, IL
Bid Date: Jun 24 2025
Litchfield, IL
Bid Date: Jul 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
