Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 31, 2021 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Brownsville, Texas. Contact the soliciting agency for additional information.
This Specification covers the design, shop fabrication, delivery, surface preparation, galvanizing and related items necessary to complete the steel poles as indicated on the Drawings and as specified herein. It is the intent of this Specification to have the poles designed, fabricated and delivered in accordance with the most advanced and modern technical and commercial practice. Poles furnished shall be complete, ready for use, and suitable in all respects for the service indicated, despite omission of specific reference to any minor component part. Questions concerning terms, conditions, and technical specifications should be directed to: Hugo E. Lopez, Purchasing or Diane Solitaire, Materials/Warehouse Manager Each bid shall constitute an offer to the Board, as outlined therein, and shall be irrevocable for at least ninety (90) days after the time announced for the opening thereof. Firm is required to execute a contract and furnish a Supply Bond. The supply bond shall be valid from the notice of award until the acceptance of the Steel Structures. Additionally, in lieu of supply bond, a letter of credit (LOC) from a Texas institution is acceptable. If the successful firm fails to execute the contract and to furnish a satisfactory Supply Bond within 10 days from the date on which he is notified that his bid has been accepted, the amount of his check or supply bond shall be forfeited to the Brownsville PUB as mutually agreed to liquidated damages, and not as a penalty. The Brownsville Public Utilities Board will not be responsible in the event that the U.S. Postal Service or any other courier system fails to deliver the sealed bid to the Brownsville Public Utilities Board, Purchasing Office by the given deadline above. Electronic transmission or facsimile of Bid will not be acceptable The Brownsville PUB reserves the right to reject any or all bids and to waive irregularities contained therein and to accept any bid deemed most advantageous to the Brownsville PUB. August 20, 2021 - Last day to submit questions
Post-Bid
Power Plant
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2021
October 8, 2021
915 S Central Ave, Brownsville, TX
Related To This Project
Brownsville, TX
Bid Date: Feb 03 2021
Brownsville, TX
Bid Date: Aug 18 2021
Brownsville, TX
--
Brownsville, TX
Bid Date: Dec 04 2020
Brownsville, TX
Bid Date: Mar 03 2021
Brownsville, TX
Bid Date: Mar 31 2021
Brownsville, TX
Bid Date: Mar 10 2021
Brownsville, TX
Bid Date: Mar 31 2021
Brownsville, TX
Bid Date: Jul 06 2022
Brownsville, TX
Bid Date: Sep 14 2022
Brownsville, TX
Bid Date: Feb 16 2022
Brownsville, TX
Bid Date: Aug 18 2022
Brownsville, TX
Bid Date: Mar 30 2022
Brownsville, TX
Bid Date: Mar 23 2022
Brownsville, TX
Bid Date: Apr 13 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
