BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milwaukie, Oregon. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

International Way SAFE/SSMP: Fill in sidewalk gaps on both sides of the street, remove barriers, construct bicycle facility improvements, replace asphalt roadway surface from 37th Avenue to Lake Road. International Way & Wister Street Underground Storage: Construct underground storage within piped storm system and install upsized pipe within existing system to elimanate potential flooding International Way Sewer Replacement: To address two significant bellies (211'-260' and 330'- 340'), which create debris buildup that can go septic. Two plumber laterals may need grease traps. Replacement should be during dry season due to ground water issues and may require dewatering. MH 3033 - 3032: Length 354.2', Upstream depth 10.5', Downstream depth 11.5', Number of services 3, Diameter 12" International Way Pipe Extension: Install of 820 feet of 12-inch ductile iron water main from Freeman Way to Mallard Way to tie together the entire length of International Way which would provide increased water flow capacity coupled with improved water quality. Project will include installation of a three-valve cluster fire hydrant at the midpoint to provide for proper unidirectional flushing and installation of a sample station at the northwest end of the new main. Accommodation of storm or wastewater systems may be necessary to accept large water volumes during flushing activities. Replacement of existing valves and reconnection of water services and hydrants will be included. Mallard Street SAFE: Construct sidewalk from International Way to the Mallard Bridge. As of August 16, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$3,282,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
61
Bidding Soon
1,088
All Active Projects
412
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.