BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a clubhouse / community center in Thompsons Station, Tennessee. Completed plans call for site work for a 1,350-square-foot, one-story above grade clubhouse / community center.

As of 10/11/2021 This project has not been awarded. Williamson County is accepting bids for Bethesda Community Center, Phase 1. This includes site work and artificial turf. Site address is Bethesda Road, Thompson's Station, TN 37179. Solicitation -21056 B. The project consists of furnishing all labor, materials, services, and equipment for fabrication. defrvery, and erection of all items of work related to Phase 1 of a three phase development on a 44.22 acre site for the Williamson County Government to be operated by the Williamson County Parks & Recreation Department. The Project Scope in Phase 1 shall include the follow-ing: o Grading of the site, stormwater systems, and installation of retaining walls as indicated on the Contract Documents shall be Included in the Scope of Work for Phase 1. Portions of the site for Phase 3 shall be rough graded in Phase 1 in anticipation for construction of Phases 2 and 3. The design intent is for the parking areas to be pervious pavers with de-tention storage under the parking areas. o Base course for the parking area indicated in the Contract Documents anticipating instal-lation of pervious pavers In Phase 2 to minimize construction traffic on finished parking ar-eas shall be included in Phase 1. o The main entry drive into the site as indicated on the Contract Documents shall be includ-ed in Phase 1. o The walking trails/service vehicle access around the fields and walking trail leading to a potential pedestrian bridge connection to the residential subdivision to the west of the proposed site as Indicated on the Contract Documents. The pedestrian bridge shalt be constructed under a separate agreement. o Reinforcedoconcrete sidewalks os Indicated on the Contract Documents. o Site utilities including water, sewer, power, and communication conduits as indicated on the Contract Documents for Phase 1 shall be completed as port of Phase 1. o The water service for Phase 1 shall be Included in the Scope of Work for this Project os indicated on the Contract Documents. o The warwater system shall tie into and shall be served by the residential develop-ment directly to the west of the site. The portion of the wastewater system that is off site is being completed under a separate agreement with the Owner, and the sewer system shown In the Contract Documents is part of this Scope of Work and shall tie to the off-site system noted above. Coordination with the off-site utility construction shall be part of this Scope of Work. Timing and installation of sewer lines under fields shall be coordinated with the Contractor performing the Scope of Work for the wastewater system being completed under a separate agreement. o Coordination with the Scope of Work being completed under separate agreements Is necessary as part of the Scope of Work in Phase 1. o Eight (8), artificial turf soccer fields as indicated in the Contract Documents shall be port of the Scope of Work for Phase 1. o Sports field and parking lot lighting shall be completed under a separate agreement with the Owner during Phase 1. Coordinate with this Scope of Work is necessary as part of the Scope of Work In Phase 1. o A soccer pavilion with a storage room shall also be Included as part of the Scope of Work for Phase 1. The building systems will be constructed with reinforced-concrete slabs-on-grade with reinforced-concrete strip wall footings and reinforced-concrete spread column footings. The building superstructures will consist of CMU bearing/shear walls, steel col-umns and beams. and a pre-engineered, wood beam/truss roof structure. The exterior enclosure systems shall consist of manufactured stone veneer w/ advanced composite siding and shall also Include painted, hollow metal doors and frames and a coiling, over-head garage door. Portions of the building shall also include load-bearing and non-load bearing CMU wan construction. The roofing systems shall consist of a standing seam met-al roof system. The Scope of Work Includes installation of heating and ventilation, water, and electrical sewing the building. This Scope of Work shall also include a pedestrian bridge connecting to the proposed parking area. In addition, The project shall include In-terior construction, reinforced-concrete pads & sidewalks. and coordination/hook-up of/connection to owner-furnished/vendor-Installed equipment. The Work will be construct-ed under a single. lump-sum, prime contract.

Award

Clubhouse / Community Centers

$6,750,000.00

Public - County

Site Work

66

18

64

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
26
Bidding Soon
739
All Active Projects
311
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2021

October 11, 2021

img_map_placeholder

Multiple Locations, Thompsons Station, TN

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.