BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 21, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a sidewalk / parking lot in Boca Raton, Florida. Working plans call for site work for a sidewalk / parking lot.

For the design, permitting, fabrication and installation of aluminum walkway covers. The work will include all supervision, labor, materials, equipment and supplies. design, permitting, fabrication and installation of aluminum walkway covers. Questions Due : September 3, 2021 , No Later Than 2:00 P.m . Via Electronically Estimated project budgets : calusa elementary school $90,000 sable palm/high ridge family center $24,000 spanish river community high school $240,000 Locations- panish River Community High School , 5100 Jog Road, Boca Raton (first location) Calusa Community Elementary School , 2051 Clint Moore Road, Boca Raton Sable Palm/High Ridge Family Center , 4200 N. Australian Avenue, West Palm Beach

Final Planning

Sidewalks / Parking Lot

$354,000.00

Public - County

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
149
Bidding Soon
1,936
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2021

January 20, 2022

Project location map

Multiple Locations, Boca Raton, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.